Advanced Refrigeration - ARS2024006
#68of 389 in United States#33of 195 in American Carbon Registry (ACR)
Audit Analysis
A multi-state US refrigerant-replacement project under ACR with VVB-confirmed additionality and internally consistent ERR figures, but weakened by three material findings requiring corrective action, a project-specific (non-jurisdictional) baseline, and several monitoring parameters (usage method, FNRB) not stated in the available documents. The full lifetime ERR was verified in a single two-week monitoring window, which is consistent with the one-time nature of refrigerant replacement but limits the depth of operational monitoring evidence.
Red Flags
- Three material findings in the monitoring report (incorrect location reference, stray retrofit-project text, wrong project start date) each require corrective action, indicating quality-control gaps in the project documentation
- The validation report does not address leakage or reversal events, while the monitoring report states leakage is 'deemed negligible' — the inconsistency between the two documents weakens the evidentiary chain
- Usage monitoring method and FNRB methodology are not stated in any available document, leaving the operational-verification basis for the 10-year crediting period undocumented
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 43,305 | 0 | 43,305 | |
| Total | 43,305 | 0 | 43,305 |
Risk Indicators
VVB-confirmed combined test
Technology-based; no reversal risk
Deemed negligible; validation report silent
Project-specific; no reassessment date
Mentioned but FPIC not conducted; grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →