Advanced Refrigeration - ARS2025004
#260of 345 in United States#118of 147 in American Carbon Registry (ACR)
Audit Analysis
This ACR Advanced Refrigeration project (ARS2025004) has VVB-confirmed additionality via a combined test and a recognised methodology, but the verification process surfaced six material findings requiring corrective action, including errors in the emissions-reduction total and inconsistent project details across documents. The verified ERR of 151,077 tCO₂e matches the full lifetime ex-ante estimate despite covering only a four-day monitoring window, raising a significant over-crediting concern. Leakage is deemed negligible without a quantified deduction, and the project-specific baseline lacks a stated reassessment date.
Red Flags
- Six material findings were reported in the monitoring report (2026-07-17), including errors in the ER total, inconsistent facility start dates, and incorrect refrigerant/location details, each requiring a corrective action
- The verified ERR of 151,077 tCO₂e equals the full lifetime ex-ante estimate yet was verified over a four-day monitoring window (2025-08-05 to 2025-08-08), representing roughly 915× the pro-rata expectation for the elapsed period
- Crediting period is inconsistent between the issuance document (2025-01-15 to 2035-01-14) and the monitoring report (2025-08-05 to 2035-08-04), a seven-month discrepancy
- Leakage is deemed negligible with no quantified deduction or detailed technical justification provided in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 151,077 | 0 | 151,077 | |
| Total | 151,077 | 0 | 151,077 |
Risk Indicators
VVB-confirmed combined test
Industrial process – no carbon-stock reversal risk
Deemed negligible, no quantified deduction
Project-specific, no reassessment date
Mentioned but FPIC not conducted, grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →