Advanced Refrigeration - ARS2025006
#251of 345 in United States#114of 147 in American Carbon Registry (ACR)
Audit Analysis
This ACR-registered advanced refrigeration project has VVB-confirmed additionality but is undermined by significant scope confusion (US states listed as location while corrective actions reference Mexico), a single-day monitoring period for a 10-year crediting period, and multiple material findings requiring scope and data revisions. The identical ERR figures across claimed, verified, and ex-ante lifetime measures, combined with the absence of FNRB and usage-monitoring details, limit confidence in the credit quantity.
Red Flags
- Project location is contradictory: the registry lists eight US states, yet the monitoring report's corrective actions direct removal of US regulatory references and addition of Mexico net-zero objectives, suggesting the actual project site may be in Mexico
- Monitoring period spans a single day (2025-12-03 to 2025-12-03) while the crediting period is ten years, and the verified ERR (39,047) equals the full lifetime ex-ante estimate, making it unclear what was actually monitored
- Multiple material findings required exclusion of the Gala Foods – Centereach, NY location and revision of the Giant Eagle location scope, indicating the project boundary was not stable at the time of verification
- Leakage is deemed negligible without any quantified deduction or detailed justification in the monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 39,047 | 0 | 39,047 | |
| Total | 39,047 | 0 | 39,047 |
Risk Indicators
VVB-confirmed combined test
Technology-based; no carbon-stock reversal risk
Deemed negligible, not quantified
Project-specific; no reassessment date
Mentioned but FPIC and grievance mechanism absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →