Advanced Refrigeration - ARS2026001
#227of 345 in United States#102of 147 in American Carbon Registry (ACR)
Audit Analysis
This ACR advanced-refrigeration project in the US has a VVB-confirmed additionality assessment but is undermined by four material findings (including a cooling-capacity calculation error) and a striking identity between the verified, claimed, and lifetime ex-ante ERR figures (all 44,494) despite only nine months of a ten-year crediting period having elapsed. The project-specific baseline, a leakage justification that is contradicted between the validation and monitoring reports, and the absence of CORSIA/CCP status information further weaken confidence in the credit claims.
Red Flags
- Verified ERR (44,494) equals the full lifetime ex-ante estimate despite only ~9 months of the 10-year crediting period having elapsed, implying the project delivered roughly 13× the pro-rata expectation for the elapsed period.
- Material finding: cooling capacity applied in calculations for Cypress Cold LTC-1 was inconsistent with verification evidence, directly affecting credit quantities.
- Leakage justification is stated as 'deemed negligible' in the monitoring report but is not addressed at all in the validation report, creating an unresolved contradiction.
- Four material findings and four corrective actions were required, spanning GPS coordinates, data-source entries, vintage year, implementation dates, and calculation inputs.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 44,494 | 0 | 44,494 | |
| Total | 44,494 | 0 | 44,494 |
Risk Indicators
VVB-confirmed combined test
Technology-based; no carbon-stock reversal risk
Deemed negligible but unconfirmed by VVB
Project-specific; no reassessment date stated
Mentioned but FPIC not conducted; grievance mechanism absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →