Advanced Refrigeration CAL - ARS 005B
#82of 110 in Water#269of 389 in United States#145of 195 in American Carbon Registry (ACR)
Audit Analysis
This ACR-registered advanced refrigeration project in Missouri has VVB-confirmed additionality and a recognised methodology, but the verification report identified three material findings—including doubled unit counts and incorrect baseline charge sizes—that raise serious over-crediting concerns. The verified first-year reductions (18,613 tCO₂e) represent only about 46% of the pro-rata expectation derived from the ex-ante lifetime estimate, and the leakage treatment is inconsistently documented across the PDD and validation report.
Red Flags
- Verification report (Jan 2021) found unit counts were incorrectly doubled for dual-compressor models, meaning the ex-ante ERR of 401,754 tCO₂e may be materially overstated
- Baseline default charge sizes were assigned incorrectly for several equipment types, undermining the validity of the project-specific baseline
- Leakage is stated as 0% with the PDD calling it 'deemed negligible' while the validation report does not address it at all—no quantitative justification is provided in either document
- Verified first-year reductions of 18,613 tCO₂e are only ~46% of the pro-rata expectation (~40,175 tCO₂e) derived from the 10-year ex-ante estimate, suggesting either over-crediting in the baseline or under-performance
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 18,605 | 0 | 18,605 | |
| Total | 18,605 | 0 | 18,605 |
Risk Indicators
VVB-confirmed combined test
Technology-based; no reversal risk
0% deduction; justification inconsistent across docs
Project-specific; material errors found; no reassessment
Mentioned but FPIC and grievance mechanism not documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →