Skip to main content
ACRIndustrial Process EmissionsMISSOURI, USGeneral Methodologyv2.1

Advanced Refrigeration CAN - ARS 001C

ACR-527 ↗

#82of 108 in Water#240of 345 in United States#109of 147 in American Carbon Registry (ACR)

4.3/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
3.5
Documentation
4.0

Audit Analysis

The Advanced Refrigeration ARS 001C project has VVB-confirmed additionality but is undermined by 11 material findings in the verification report, including incorrect GWP values for R-290, wrong equipment charge sizes, and a boundary omission (SSR 7). The verified emissions reductions for the 2016–2018 monitoring period (1,000,000 tCO₂e) are approximately 371% of the pro-rata expectation derived from the lifetime ex-ante estimate, raising serious over-crediting concerns. Leakage treatment is contradictory across documents and the project-specific baseline lacks a stated reassessment schedule.

Red Flags

  • Verified ERR of 1,000,000 tCO₂e for the 3-year monitoring period is ~371% of the pro-rata expectation (~269,295) derived from the 1,077,179 tCO₂e lifetime ex-ante estimate over the 12-year crediting period, indicating potential over-crediting
  • Eleven material findings in the verification report include an incorrect GWP applied to R-290, non-equipment-specific charge sizes in baseline calculations, and SSR 7 (Equipment Disposal) incorrectly excluded from the project boundary
  • Leakage justification is contradictory: the validation report (April 2021) states it was 'not addressed' while the PDD (February 2021) claims it was 'deemed negligible', with a 0% deduction applied
  • Twelve corrective actions were required, indicating the project plan and monitoring reports contained multiple unresolved errors at the time of verification

Credit Vintages

IssuedRetiredAvailable
2016
17,4534,00413,449
Total17,4534,00413,449

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No reversal risk (refrigeration)

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment stated

Safeguards

Mentioned but no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents