Advanced Refrigeration CAN - ARS 004C
#83of 110 in Water#270of 389 in United States#146of 195 in American Carbon Registry (ACR)
Audit Analysis
This ACR-registered advanced refrigeration project (ARS 004C, Missouri/US) has VVB-confirmed additionality via a combined test, but the verification report identified eight material findings—including incorrect baseline charge sizes, misclassified equipment, and monitoring-plan deficiencies—each requiring corrective action. The 0% leakage deduction lacks a consistent justification across documents, and the ex-ante lifetime estimate (480) sits at a very different magnitude from the verified 2019 figure (480,748), raising questions about unit consistency or baseline robustness. Overall, the project is structurally sound but carries meaningful data-quality and baseline-accuracy concerns.
Red Flags
- Eight material findings in the May 2021 verification report, including incorrect baseline default charge sizes and incorrect equipment classification in the ACR599 dataset, directly undermine baseline accuracy
- Leakage deduction of 0% is justified as 'deemed negligible' in the PDD but listed as 'not addressed' in the validation report—an inconsistency that weakens the leakage treatment
- The ex-ante lifetime estimate of 480 (validation report, Dec 2020) and the verified 2019 figure of 480,748 (verification report, May 2021) differ by three orders of magnitude; if both are in the same unit, the project delivered roughly 10,000% of the pro-rata expectation, which is implausible and suggests a unit or scope error
- Usage monitoring method is listed as 'assumed' with a usage rate of 7.75 that was never independently verified, reducing confidence in the activity-level data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 34,725 | 0 | 34,725 | |
| Total | 34,725 | 0 | 34,725 |
Risk Indicators
Combined test, VVB-confirmed
Technology-based; no carbon-stock reversal risk
0% deduction, justification inconsistent across docs
Project-specific; material findings on charge sizes
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.