Skip to main content
ACRIndustrial Process EmissionsMISSOURI, USGeneral Methodologyv2.1

Advanced Refrigeration CAN - ARS 006C

ACR-708 ↗

#67of 110 in Water#216of 389 in United States#117of 195 in American Carbon Registry (ACR)

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

This advanced refrigeration project under ACR has a sound jurisdictional baseline and VVB-confirmed additionality, but the verification report identified seven material findings—including incorrect baseline charge sizes and GWP values—requiring corrective actions. Leakage is set at 0% with an inconsistent justification across documents, and the first-year verified reductions (25,376 tCO2e) represent only about 72% of the pro-rata expectation from the lifetime estimate, raising questions about the robustness of the ex-ante projections.

Red Flags

  • Seven material findings in the verification report (2022-03-08), including incorrect baseline default charge sizes, an incorrect baseline refrigerant GWP, and a project emissions calculation that used the baseline charge size instead of the alternative refrigerant charge size
  • Leakage deduction of 0% with justification described as 'deemed negligible' in the PDD but not addressed at all in the validation report (2023-08), leaving the basis for the zero deduction unclear
  • First-year verified reductions of 25,376 tCO2e (verification report, 2022-03-08) are only ~72% of the pro-rata expectation of ~35,123 tCO2e derived from the 351,233 tCO2e lifetime estimate, suggesting potential over-crediting in the ex-ante projection

Credit Vintages

IssuedRetiredAvailable
2021
18,868018,868
Total18,868018,868

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Technology-based, no reversal risk

Leakage

0% deduction, justification inconsistent

Baseline

Jurisdictional but had material errors

Safeguards

Mentioned but details not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-12General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents