Advanced Refrigeration CAN - ARS 006C
#67of 110 in Water#216of 389 in United States#117of 195 in American Carbon Registry (ACR)
Audit Analysis
This advanced refrigeration project under ACR has a sound jurisdictional baseline and VVB-confirmed additionality, but the verification report identified seven material findings—including incorrect baseline charge sizes and GWP values—requiring corrective actions. Leakage is set at 0% with an inconsistent justification across documents, and the first-year verified reductions (25,376 tCO2e) represent only about 72% of the pro-rata expectation from the lifetime estimate, raising questions about the robustness of the ex-ante projections.
Red Flags
- Seven material findings in the verification report (2022-03-08), including incorrect baseline default charge sizes, an incorrect baseline refrigerant GWP, and a project emissions calculation that used the baseline charge size instead of the alternative refrigerant charge size
- Leakage deduction of 0% with justification described as 'deemed negligible' in the PDD but not addressed at all in the validation report (2023-08), leaving the basis for the zero deduction unclear
- First-year verified reductions of 25,376 tCO2e (verification report, 2022-03-08) are only ~72% of the pro-rata expectation of ~35,123 tCO2e derived from the 351,233 tCO2e lifetime estimate, suggesting potential over-crediting in the ex-ante projection
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 18,868 | 0 | 18,868 | |
| Total | 18,868 | 0 | 18,868 |
Risk Indicators
Combined test, VVB-confirmed
Technology-based, no reversal risk
0% deduction, justification inconsistent
Jurisdictional but had material errors
Mentioned but details not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →