Advanced Refrigeration US49 - ARS 005
#50of 110 in Water#183of 389 in United States#94of 195 in American Carbon Registry (ACR)
Audit Analysis
The Advanced Refrigeration US49 project (True Manufacturing, Inc.) has VVB-verified additionality via a combined test, but the verification report identified three material findings—incorrect baseline charge sizes, doubled unit counts for dual-compressor models, and non-compliant monitoring report formatting—each requiring corrective action. The project delivered roughly 46% of its pro-rata first-year expectation, which is conservative, yet the baseline errors raise questions about the accuracy of the ex-ante estimate. Leakage is set at 0% with an inconsistent justification across documents, and several key monitoring and eligibility fields remain unstated.
Red Flags
- Three material findings in the verification report (2021-01-14): incorrect baseline default charge sizes, unit counts doubled for dual-compressor models, and monitoring reports not using the current ACR template—each requiring corrective action
- ERR contradiction: the validation report (2022-01) lists 401,754 tCO₂e as verified, while the verification report (2021-01-14) reports only 18,613 tCO₂e for the 2020 monitoring period, creating ambiguity about the actual verified figure
- Leakage justification is inconsistent: the PDD (2021-11-11) states leakage is 'deemed negligible' while the validation report (2022-01) marks it as 'not addressed', leaving the 0% deduction without a clear, consistent rationale
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 367,047 | 0 | 367,047 | |
| Total | 367,047 | 0 | 367,047 |
Risk Indicators
VVB-verified combined test
N/A – industrial process, no reversal risk
0% deduction, inconsistent justification
Project-specific, material errors found
Mentioned but details not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →