Vai al contenuto principale
GS A/R China Documentazione completa General Methodology v2.0

Afforestation Project in Tongliao, Inner Mongolia

GS-1205 ↗

5.6 / 10
Integrity
6.4
Transparency
5.2
Claim Safety
5.8
Documentation
4.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under the Gold Standard afforestation/reforestation methodology.

missing The verification report notes multiple CARs and CLs, and the record contains contradictions on leakage treatment and reversal handling.

Transparency

verified The monitoring period is stated for 2021-01-01 to 2023-12-31, and the VVB is named as Carbon Check (India) Private Limited.

missing Claimed versus verified ER figures are not found in the extracted record, and usage monitoring details are not stated.

Claim Safety

verified The project is an A/R activity with a project baseline and a 0% leakage deduction, which is directionally supportive of lower over-crediting risk.

missing CORSIA eligibility is true while CCP status is not mentioned, and the contradiction on leakage justification weakens confidence in the claim.

Documentation

verified The record includes many extracted fields, a named VVB, and a recent validation report dated 2025-03-24.

missing Extraction confidence is low, only one evidence document is listed, and the record shows multiple closed CARs and CLs plus several contradictions.

Detailed Analysis

Integrity

The project has a stronger-than-average integrity profile because the VVB confirmed additionality and the project uses a combined additionality test under the Gold Standard afforestation/reforestation methodology. A 20% buffer pool is in place and no reversal or loss events are reported, which supports permanence. That said, the verification report records seven clarification requests, four corrective action requests, and one prior FAR that were closed, which indicates some implementation or documentation issues.

Transparency

Transparency is moderate because the monitoring period is clearly stated and the VVB is identified as Carbon Check (India) Private Limited. However, the extracted record does not state claimed or verified ER totals, and usage monitoring is not described. The low extraction confidence also suggests at least one key document was difficult to read, which weakens confidence in the completeness of the public record.

Claim Safety

Claim safety is moderate but not strong. The project is an afforestation activity with a project baseline and a stated leakage deduction of 0%, and leakage is described as negligible, which helps reduce over-crediting concerns. On the other hand, CORSIA eligibility is true while CCP status is not mentioned, so dual-market claim risk is not fully resolved from the available record.

Documentation

Documentation quality is limited by low extraction confidence and the fact that only one evidence document is listed in the extracted record. The validation report is recent, but the record still contains multiple closed CARs and CLs, suggesting the documentation required substantial follow-up. The contradictions on benefit sharing, leakage treatment, reversal handling, and the crediting period further reduce reliability.

Overall

Overall, this is a mid-quality project with some solid integrity signals, especially VVB-confirmed additionality, a buffer pool, and no reported reversals. I privileged the 2025-03-24 validation report over older material where contradictions existed, because it is the more recent document, but I still discounted the score because the record itself flags inconsistencies on benefit sharing, leakage, reversal treatment, and the crediting period. The low extraction confidence and missing ER totals keep transparency and documentation from scoring higher.

Audit Analysis

This is an afforestation project with a VVB-confirmed additionality test, a 20% buffer pool, and no reported reversal events, which supports moderate integrity. However, the record has low extraction confidence, several closed CARs/CLs, and contradictions on benefit sharing, leakage treatment, reversal handling, and the crediting period, which reduce confidence in the documentation and claims.

Project Description

Developer: Climate Bridge (Shanghai) Ltd. Type: A/R Size: Large Scale Crediting period: 2014-04-11 → 2043-04-11 Estimated annual credits: 10000 tCO2e SDGs: Goal 15: Life On Land, Goal 12: Responsible Production and Consumption, Goal 13: Climate Action

Red Flags

  • Low extraction confidence and only one evidence document listed, despite many extracted facts.
  • Contradictions in the record on benefit sharing, leakage justification, reversal treatment, and the crediting period.

Credit Vintages

Issued Retired Available
2018
1,307 106 1,201
2019
4,821 254 4,567
2020
5,459 1,192 4,267
2021
1,659 665 994
2022
1,659 0 1,659
2023
1,659 837 822
Total 16,564 3,054 13,510

Cosa migliorerebbe questo punteggio

  • Publish the verified emission reduction totals, monitoring methodology, and a clearer leakage justification in the public record.
  • Resolve the documented contradictions by issuing a reconciled version of the validation/verification evidence and clarifying the crediting period and benefit-sharing status.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed test present

Permanence

buffer pool present, no reversals reported

Leakage

0% deduction with mixed documentation

Baseline

project baseline, reassessment timing missing

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA-eligible, CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti