AGA FANO Liquid CO2 production using CO2 from a fermentation plant at Ingenio Providencia
#50of 124 in Colombia#720of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM CO2-usage project capturing fermentation byproduct CO2 for liquid CO2 production in Colombia, validated by ICONTEC with a combined additionality test. The project carries moderate integrity risk due to five material findings (including baseline data inconsistencies and weak additionality justification) and six required corrective actions, though the usage-based credit type inherently limits permanence risk. Transparency is limited by the absence of verified ERR figures, end-use tracking data, and a stated monitoring methodology in the extracted record.
Red Flags
- Five material findings in the validation report, including a baseline data inconsistency between natural gas consumption and CO2 production records in PDD v1, and lack of calibration records for CO2 measurement equipment over the 5-year baseline period
- Insufficient justification for additionality barriers related to raw material supply risks (sugar cutter conflict) flagged as a material finding, undermining the robustness of the combined additionality test
- Total verified ERR is not found in the extracted record, preventing any pro-rata comparison against the 66,198 tCO2 lifetime claim
- Six corrective actions were required, including correcting baseline data, updating emission factor sources, and establishing formal calibration procedures — indicating the initial documentation did not meet full CDM requirements
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 66,837 | 0 | 66,837 | |
| Total | 66,837 | 0 | 66,837 |
Risk Indicators
VVB-confirmed but justification questioned
Usage project, no inherent reversal risk
0% deemed negligible, thin justification
Measured but data inconsistency found
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →