Agroceres Methane capture and combustion at Granja Paraiso
#13of 211 in Brazil#213of 1459 in CDM (UNFCCC)#4of 105 in AMS-III.D
Audit Analysis
A CDM biogas capture project (AMS-III.D) with a solid VVB-verified additionality assessment and no serious material findings, but weakened by a project-specific modeled baseline, inconsistent leakage justifications across documents, and first-period ERR delivery at roughly 64% of the pro-rata expectation. Several key monitoring parameters (fnrb method, usage monitoring, CORSIA/CCP status) are absent from the extracted record, limiting full verification.
Red Flags
- Leakage justification is inconsistent: the validation report (2010) states 'deemed negligible' while the monitoring report (2011) states 'quantified', yet both documents apply a 0% deduction — the basis for the zero deduction is not clearly documented
- First monitoring period ERR (11,050 tCO2e) is only ~64% of the pro-rata expectation derived from the ex-ante estimate (121,210 tCO2e over 7 years), suggesting the baseline or activity assumptions may be optimistic
- Crediting period start date differs between the validation report (2010-05-01) and the monitoring report (2010-08-28), creating ambiguity about the exact baseline reference period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 10,343 | 0 | 10,343 | |
| Total | 10,343 | 0 | 10,343 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, inconsistent justification
Project-specific, modeled
Mentioned but details not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →