Aguan biogas recovery from Palm Oil Mill Effluent (POME) ponds and biogas utilisation - Exportadora del Atlántico, Aguan/Honduras
#208of 268 in Biogas#16of 20 in Honduras#1320of 1459 in CDM (UNFCCC)#45of 55 in AMS-III.H
Audit Analysis
The Aguan POME biogas project has a solid additionality foundation (VVB-confirmed investment test by TÜV SÜD) and resolved validation findings, but is undermined by a severe seven-fold discrepancy in claimed emissions reductions between the validation report and an appendix, a contradiction in baseline methodology, and a near-total absence of monitoring or verification data. The low extraction confidence and missing key parameters (buffer pool, FN-RB, usage rates, verified ERR) leave substantial uncertainty about the project's actual credit volume and integrity.
Red Flags
- Seven-fold discrepancy in total claimed ERR: 30,183 tCO₂e in the validation report versus 211,284 tCO₂e in an appendix — a factor-of-7 gap that cannot be reconciled without further documentation
- Baseline method contradicted across documents: the validation report describes a project-specific baseline while an appendix references a jurisdictional baseline, fundamentally altering the credit calculation
- No monitoring period, verified ERR, or usage monitoring method found in any available document — the project's actual performance is entirely unverified
- Leakage treatment contradicted: the validation report states leakage was 'deemed negligible' (0% deduction) while an appendix indicates it was 'quantified', creating ambiguity about whether a real deduction was applied
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and critical data may be missing
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, method contradicted
Mentioned but no FPIC or grievance detail
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →