Akbuk II Wind Farm Project, Turkey

GS-578 ↗ · current registry ID: GS3411

#343of 1935 in Renewable energy#74of 295 in Turkey#146of 1801 in Gold Standard (GS)#254of 1287 in ACM0002

6.0/ 10
Integrity
6.2
Transparency
5.8
Claim Safety
6.3
Documentation
5.2

Audit Analysis

The Akbuk II Wind Farm is a Gold Standard wind project with VVB-confirmed additionality and a reasonable 0% leakage deduction, but it is undermined by eight inter-document contradictions (baseline method, crediting period, FPIC status, grid emission factor, and others) that erode confidence in the data record. The verified ERR exceeds the PDD ex-ante estimate, which is positive for claim safety but suggests the original projection was imprecise. No buffer pool is stated and reversal risk is explicitly not addressed, leaving a gap in permanence assurance.

Red Flags

  • Crediting period is stated as 2017–2022 in the verification report but 2018–2028 in the monitoring report — a 6-year discrepancy that affects the pro-rata ERR calculation and the project's current validity status.
  • Baseline method is described as 'project' in the verification report (2025) but 'jurisdictional' in the monitoring report (2023); for a wind project the baseline should be the grid emission factor, so the 'project' label is inconsistent with standard practice.
  • No buffer pool percentage is stated in any available document, and reversal events are explicitly marked as 'not addressed', leaving permanence risk unquantified.
  • FPIC is recorded as conducted in the 2025 verification report but as not conducted in the 2023 PDD — a material inconsistency in a core safeguard.
  • One Forward Action Request from the 2025 validation remains open and is deferred to the initial verification of the renewed project activity.

Credit Vintages

IssuedRetiredAvailable
2020
5,8071165,691
2021
35,003035,003
2022
5,91705,917
Total46,72711646,611

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal not addressed

Leakage

0% deduction, justified for grid wind

Baseline

Method contradicted across documents

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents