Akcay 28.78 MW, Hydroelectric Power Plant Project (Hepp), Turkey

VCS-1174 ↗

#1079of 1935 in Renewable energy#22of 26 in Türkiye#693of 1339 in Verra (VCS)#845of 1287 in ACM0002

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.5
Documentation
3.5

Audit Analysis

The Akcay 28.78 MW hydroelectric project is a registered VCS avoidance credit with VVB-confirmed additionality and no reversal events, but it is undermined by a project-specific baseline, a 2007 grid emission factor, nine material findings with corrective actions, and multiple internal contradictions within the verification report. The low extraction confidence and inconsistent documentation of safeguards (FPIC, grievance mechanism) further erode confidence in the project's integrity and transparency.

Red Flags

  • Nine material findings and nine corrective actions required in the 2024 verification report, including missing net ERR equation, missing pre-project scenario description, and incorrect project scale categorization
  • Grid emission factor dated 2007 (0.4607 tCO2/MWh) — over 17 years old and potentially significantly out of date for Turkey's evolving grid mix
  • Internal contradictions within the same 2024 verification report on safeguards, FPIC, grievance mechanism, and benefit sharing (fields simultaneously recorded as true and false)
  • Baseline method contradicted between the 2024 verification report (project-specific) and the 2024 monitoring report (jurisdictional)

Credit Vintages

IssuedRetiredAvailable
2009
2,7262,7260
2010
5,3105,3100
2011
13,2526,0597,193
2013
35,71335,7130
2014
29,35229,3520
2015
75,681075,681
2016
28,917028,917
2017
23,05812,19910,859
2018
20,07920,0790
2019
37,4386,97030,468
2020
16,444016,444
2021
8,56608,566
2022
22,241022,241
2023
9,00509,005
Total327,782118,408209,374

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

hydro is low-risk but no permanence safeguard documented

Leakage

0% deduction; justification inconsistent between documents

Baseline

Project-specific baseline; 2007 grid EF; reassessed 2021

Safeguards

No FPIC, no grievance mechanism, no safeguards documented

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents