Akcay 28.78 MW, Hydroelectric Power Plant Project (Hepp), Turkey

VCS-1174 ↗

5.1 / 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.6
Documentation
6.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the newer validation record cites an investment test.

missing Leakage is marked as not addressed in the monitoring report, and the baseline was last reassessed in 2009.

Transparency

verified The monitoring period, crediting period, and VVB identity are stated in the extracted documents, and no material findings were reported.

missing The monitoring report does not state a usage monitoring method, and the large discrepancy in verified emissions reduces reporting reliability.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of market-claim risk.

missing The emission reduction figures conflict materially between validation documents, and leakage justification is inconsistent across reports.

Documentation

verified Multiple official documents were used, including validation, monitoring, PDD, and issuance records, with high extraction confidence.

missing Several key items are contradicted across documents, including additionality basis, safeguard implementation, and credited volume.

Detailed Analysis

Integrity

The project benefits from VVB-confirmed additionality and a reversal-free record, which supports the core project case. Still, the monitoring report leaves leakage not addressed, the baseline was last reassessed in 2009, and the project-specific baseline approach is less robust than a recently updated standardized baseline. These weaknesses keep integrity in the mid range rather than strong.

Transparency

The extracted record includes the VVB name, monitoring period, and both claimed and verified emission totals, and the monitoring report reports no material findings or corrective actions. However, the usage monitoring method is not stated in the available documents, and the large discrepancy between 64,201 and 242,293 tonnes undermines confidence in the reported figures. Overall transparency is therefore moderate.

Claim Safety

Claim safety is constrained by the inconsistent emissions figures and the unresolved leakage treatment. The project is not CORSIA-eligible, which helps reduce one type of market claim risk, but there is no CCP status available and the contradictory records weaken confidence that the credits are free from over-crediting concerns. The project therefore sits below average on claim safety.

Documentation

Documentation breadth is fairly good: the record draws on multiple official documents, including validation, monitoring, PDD, and issuance materials, and extraction confidence is high. The monitoring report is recent, but several important items are contradicted by later validation evidence, including the additionality test type, safeguard statements, and credited volume. That lowers documentation quality despite the number of documents used.

Overall

I privileged the newer validation report for the contradictory items where it is more recent and appears to reflect the latest credited position, but I reduced confidence because the older validation record and the monitoring report disagree on several material points. In particular, the project shows a major discrepancy in total emission reductions, a shift from barrier to investment additionality, and conflicting safeguard statements; these are reliability issues that materially weaken the score. The project is registered and has some positive evidence, but the contradictions and incomplete leakage treatment prevent a high-confidence assessment.

Audit Analysis

The project has some strengths on paper, including VVB-verified additionality, no reported reversals, and no material findings in the monitoring report. However, reliability is weakened by major contradictions in the credited volume, the additionality basis, leakage treatment, and safeguard statements across documents, which makes the claimed emission reductions less trustworthy.

Project Description

The Akcay Hes Elektrik Üretim A.Ş. installed a 28.78 MW hydropower electricity plant in Aydin, Turkey. The project generates electricity using water left from the irrigation channel and also contributes to the irrigation process by conveying water to the river bed. The estimated annual emission reduction for the project is 49,610 tCO2e.

Red Flags

  • The credited and verified emission reductions conflict sharply across validation reports, with 64,201 tonnes in the newer record versus 242,293 tonnes in an older one.
  • Leakage is not clearly justified in the monitoring report, and the project is not CORSIA-eligible, which limits claim safety.

Credit Vintages

Issued Retired Available
2009
2,726 2,726 0
2010
5,310 5,310 0
2011
13,252 6,059 7,193
2013
35,713 35,713 0
2014
29,352 29,352 0
2015
75,681 0 75,681
2016
28,917 0 28,917
2017
23,058 12,199 10,859
2018
20,079 20,079 0
2019
37,438 6,970 30,468
2020
16,444 0 16,444
2021
8,566 0 8,566
2022
22,241 0 22,241
2023
9,005 0 9,005
Total 327,782 118,408 209,374

Cosa migliorerebbe questo punteggio

  • Publish a reconciled emissions statement explaining the 64,201 versus 242,293 tonne discrepancy and identifying the authoritative source.
  • Provide a clear, quantified leakage assessment and a refreshed baseline review with consistent safeguard documentation across all reports.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed but contradictory basis

Permanence

Avoidance project; no reversals reported

Leakage

Leakage not clearly justified

Baseline

Project baseline with old reassessment

Safeguards

Safeguards present but contradicted

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-15 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti