AL-RUMAILAH Combined Cycle Power Plant
#1168of 1329 in Industrial#307of 389 in United States#90of 154 in Intl. Carbon Registry (ICR)#7of 8 in ACM0007
Audit Analysis
The AL-RUMAILAH Combined Cycle Power Plant is a 10-year avoidance project (2024–2033) under the ICR registry using methodology ACM0007 v6.1.0, claiming 42.24 million tonnes of CO₂ avoided over its lifetime by displacing grid electricity (grid EF 0.788 tCO₂/MWh). The project design is internally consistent with no material findings or contradictions, but the available record is limited to a PDD with no verification or monitoring reports, no named verification body, and low extraction confidence, leaving critical claims unconfirmed.
Red Flags
- No verification or monitoring body is named in the extracted record; additionality is stated as a combined test but VVB confirmation is absent
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project being in a community-impacting sector
- Leakage is set at 0% and deemed negligible with no quantified justification in the PDD
- Only a PDD (dated 2025-11-04) is identifiable among four source documents; no verification report or monitoring report is available
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel crediting risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1,735,759 | 0 | 1,735,759 | |
| 2022 | 4,223,680 | 0 | 4,223,680 | |
| 2023 | 4,223,680 | 0 | 4,223,680 | |
| 2024 | 4,223,680 | 0 | 4,223,680 | |
| 2025 | 4,223,680 | 0 | 4,223,680 | |
| 2026 | 4,223,680 | 0 | 4,223,680 | |
| 2027 | 4,223,680 | 0 | 4,223,680 | |
| 2028 | 4,223,680 | 0 | 4,223,680 | |
| 2029 | 4,223,680 | 0 | 4,223,680 | |
| 2030 | 4,223,680 | 0 | 4,223,680 | |
| 2031 | 2,487,921 | 0 | 2,487,921 | |
| Total | 42,236,800 | 0 | 42,236,800 |
Risk Indicators
Combined test stated; VVB confirmation absent
Avoidance project; no reversal risk
0% deduction; justification thin
Jurisdictional grid EF; no reassessment date
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →