Alize Camseki 20.8 MW Wind Farm Project, Turkey (300209)
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under ACM0002.
missing Leakage treatment is weakly supported: the record shows a leakage deduction of 0% and the contradiction log says earlier documents treated leakage as not addressed.
Transparency
verified The monitoring period is stated for 2023-07-01 to 2023-12-31, and the VVB is identified as Re Carbon Ltd.
missing Key transparency fields are missing or incomplete, including the verified emission reduction total, usage monitoring method, and FNRB information.
Claim Safety
verified The project is not shown to have double registration, and it is marked as CORSIA-eligible in the extracted record.
missing Claim safety is weakened by the project-specific baseline, missing FNRB data, and contradictions in the crediting period and leakage treatment.
Documentation
verified The record draws on many documents, with 23 documents used and several corrective actions showing active review.
missing Extraction confidence is low, one evidence document is listed only as unknown, and the monitoring report includes many formatting and consistency issues.
Detailed Analysis
Integrity
The project has a positive integrity signal because the verification report confirms additionality and the project uses a combined test under ACM0002. However, the baseline is project-specific and last reassessed in 2010, the leakage deduction is 0%, and the contradiction log shows earlier documents treated leakage as not addressed, which weakens confidence in the environmental claims.
Transparency
Transparency is moderate at best: the monitoring period is clearly stated and the VVB is named as Re Carbon Ltd., but the extracted record does not state the verified emission reduction total, the usage monitoring method, or FNRB values. The monitoring report also contains numerous internal errors and corrective actions, which suggests the reporting package is not fully clean.
Claim Safety
Claim safety is limited by missing quantitative safeguards around usage and FNRB, plus a project-specific baseline rather than a more standardized or recently reassessed baseline. The project is marked CORSIA-eligible, which does not by itself create a problem, but it means the claim should be treated cautiously because the record does not clearly rule out broader market-claim complexity.
Documentation
Documentation quality is weak because extraction confidence is low, one evidence document is not identified, and the monitoring report required many corrective actions and revisions. The record does show active verification and closure of several corrective actions, but the number of documentation issues and the missing/unclear fields reduce confidence in the completeness of the file.
Overall
I privileged the more recent monitoring-report evidence for the current period, but I also gave weight to the contradiction log because it shows unresolved reliability issues across documents. Specifically, I treated the VVB-confirmed combined additionality test as stronger than the older barrier-test reference, but I discounted the score because the record also shows contradictions on leakage treatment, reversal status, and the crediting period. The low extraction confidence and the many corrective actions further justify a conservative overall score.
Audit Analysis
This is a real wind project with VVB-confirmed additionality and a documented monitoring process, but the evidence quality is uneven. The record shows multiple corrective actions, low extraction confidence, missing key MRV fields, and contradictions on additionality, leakage treatment, reversal status, and crediting period, which reduce confidence in the claims.
Project Description
Developer: Alize Enerji Elektrik Uretim Anonim Sirketi Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2009-07-01 → 2030-06-30 Estimated annual credits: 39634 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action
Red Flags
- Multiple contradictions across documents on additionality, leakage treatment, reversal status, and the crediting period reduce reliability.
- The monitoring report contains numerous corrective actions and several documentation errors, while key MRV details such as total verified reductions and usage monitoring are not stated.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 21,581 | 21,581 | 0 | |
| 2010 | 39,989 | 39,981 | 8 | |
| 2011 | 45,204 | 45,204 | 0 | |
| 2012 | 56,058 | 56,058 | 0 | |
| 2013 | 14,687 | 14,687 | 0 | |
| 2022 | 18,085 | 0 | 18,085 | |
| 2023 | 14,642 | 0 | 14,642 | |
| Total | 210,246 | 177,511 | 32,735 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled verification package that resolves the contradictions on additionality, leakage, reversal status, and the crediting period.
- Disclose the missing MRV details, especially verified emission reductions, usage monitoring method, FNRB values, and any buffer or permanence treatment.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
No reversal event, but buffer not stated
0% deduction with weak support
Project baseline, reassessment timing old
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- T-PerfCert_V2.0-Project-Annual-Report of Camseki WPP_2022.pdf
- Final_Ver Report_1047 Çamseki Wind-VER_İrem Taşkıran_v02_30-05-2024.pdf
- T-PerfCert_V2.0-Project-Annual-Report of Camseki WPP_2023.pdf
- (1)Monitoring Report_2nd monitoring period_01-09-10 to 31-10-11_v1.3.pdf
- DEV_640.pdf
- Final_ER calculations_Camseki WPP_v0.3.xlsx
- +6 more
Other
pdd
validation
- (1)Verification Report_3rd monitoring period_01-11-11 to 31-08-12-v1.2.pdf
- (1)Verification Report_2nd monitoring period_01-09-10 to 31-10-11_v5.0.pdf
- Final Validation Report Camseki Uvecik Wind Project 06_2010 final_29_06_10.pdf
- (1)Verification Report_1st monitoring period_01-07-09 to 31-08-10_v3.0.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →