Amaime Minor Hydroelectric Power Plant
#417of 1935 in Renewable energy#10of 124 in Colombia#12of 99 in CerCarbono (CC)#311of 1287 in ACM0002
Audit Analysis
The Amaime minor hydro project is a well-structured avoidance-type renewable energy project with VVB-confirmed additionality and a jurisdictional baseline, but its integrity is tempered by multiple material findings (including closed corrective actions on baseline validity and emission-factor calculation errors) and a 0% leakage deduction whose justification language is inconsistent across two verification reports. The project delivered roughly 68% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Low extraction confidence and several missing data points (FNRB, usage monitoring, buffer pool) limit full assurance.
Red Flags
- Two corrective actions remain open at the time of the March 2026 verification report: the SDG contributions tool is incomplete and operational-readiness figures in the monitoring report do not match verified availability data.
- The leakage justification is inconsistent between two verification reports (January 2026: 'deemed negligible'; March 2026: 'quantified'), both supporting a 0% deduction — the basis for the zero deduction is therefore ambiguous.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the structured record may under-represent the full evidentiary base.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 1,955 | 0 | 1,955 | |
| 2018 | 18,803 | 0 | 18,803 | |
| 2019 | 13,377 | 0 | 13,377 | |
| 2020 | 10,781 | 2,900 | 7,881 | |
| 2021 | 21,417 | 0 | 21,417 | |
| 2022 | 17,037 | 0 | 17,037 | |
| 2023 | 11,998 | 0 | 11,998 | |
| 2024 | 8,428 | 0 | 8,428 | |
| Total | 103,796 | 2,900 | 100,896 |
Risk Indicators
Combined test confirmed by ICONTEC
Avoidance type
0% deduction; justification inconsistent across reports
Jurisdictional; reassessed 2019 (within window)
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →