Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa

CDM-7576 ↗

#1153of 1935 in Renewable energy#20of 59 in South Africa#873of 1459 in CDM (UNFCCC)#900of 1287 in ACM0002

4.9/ 10
Integrity
6.0
Transparency
4.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A 138.6 MW wind farm in South Africa validated under CDM with a confirmed barrier additionality test and jurisdictional grid baseline. However, a ten-fold discrepancy in the claimed emission reductions between the PDD and validation report, combined with the absence of any monitoring or verification data, significantly limits confidence in the project's actual performance and data reliability.

Red Flags

  • Ten-fold discrepancy in total claimed ERR: the PDD states 445,152 tCO2e while the validation report states 4,451,520 tCO2e for the same crediting period — a factor-of-10 error that undermines data reliability
  • No monitoring reports or verified ERR figures found in the available record, making it impossible to confirm actual performance against the claimed baseline
  • Grid emission factor of 0.988 tCO2/MWh is from 2010 with no evidence of periodic update, risking over-estimation of reductions if the South African grid has decarbonised since then

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

Avoidance project, no reversals

Leakage

Quantified, 0% deduction justified

Baseline

Jurisdictional grid EF, 2010 vintage, no update evidenced

Safeguards

Safeguards mentioned, benefit sharing described, but FPIC an

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents