Anaerobic Biodigesters in the Yucatán Peninsula 2
#76of 111 in Biogas#19of 27 in Mexico#175of 213 in CDM (UNFCCC)#46of 62 in AMS-III.D
Audit Analysis
This CDM biogas project (AMS-III.D) has VVB-confirmed additionality via a combined test, but suffers from significant gaps: leakage is entirely unaddressed, no buffer pool is documented, the baseline is project-specific and modeled, and five material findings required corrective action. The absence of a verified ERR figure and the contradiction between two monitoring reports on total claimed reductions (18,525 vs 23,743 tCO₂e) undermine confidence in the credit quantity.
Red Flags
- Leakage is explicitly not addressed in any available document, despite the project displacing energy use that could shift emissions to other sources
- Two monitoring reports give different total ERR claimed values (18,525 in the 2013 report vs 23,743 in the 2012 report) with no explanation for the discrepancy
- No buffer pool percentage is documented, leaving permanence risk unmitigated for a project whose credits depend on continued biodigester operation
- Five material findings (CARs) were raised at validation, including missing WMS site details, missing farm addresses, and missing baseline scenario sources
- No verified ERR figure is available in the extracted record, making it impossible to confirm actual delivery against the ex-ante estimate
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 27,365 | 0 | 27,365 | |
| 2013 | 34,724 | 0 | 34,724 | |
| Total | 62,089 | 0 | 62,089 |
Risk Indicators
VVB-confirmed combined test
No buffer pool documented
Not addressed in any document
Project-specific, modeled, no reassessment data
Mentioned but FPIC/grievance details absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →