Skip to main content
CARImproved Forest Management - WA ECO ComplianceWASHINGTON, USGeneral Methodologyv2.0

Anew � Evergreen Forestry Project

CAR-2109 ↗

#15of 69 in REDD+#13of 115 in United States#3of 32 in Climate Action Reserve (CAR)

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The project demonstrates strong leakage management through a quantified 20% deduction, but lacks independent verification confirmation and detailed MRV reporting. Documentation gaps and an unverified project-specific baseline temper the overall quality score.

Red Flags

  • Independent verification body confirmation missing
  • Project-specific baseline lacks reassessment date
  • Safeguard and grievance documentation not found
  • Buffer pool size not disclosed in available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test documented, VVB confirmation pending

Permanence

Buffer contribution unstated, reversal risk unquantified

Leakage

Quantified 20% deduction applied

Baseline

Project-specific method, reassessment date missing

Safeguards

Safeguard documentation not found

Double-claim

Eligibility status unknown, dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-05General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents