Anhui Zhujixi CMM Utilization Project
Score Breakdown
Integrity
verified Additionality was tested using an investment test and was confirmed by the VVB, China Classification Society Certification Co., Ltd., in the monitoring report.
missing Leakage treatment is disputed across documents, and reversal events are not addressed in the extracted record.
Transparency
verified The monitoring period and crediting period are clearly stated, and the monitoring report reports no material findings or corrective actions required.
missing The extracted record does not state the usage monitoring method, claimed-versus-verified issuance comparison, or buffer pool percentage.
Claim Safety
verified The project is explicitly not CORSIA-eligible, which reduces one channel of dual-claim concern.
missing Leakage and safeguards inconsistencies, plus missing CCP status and missing usage-rate evidence, leave residual over-crediting and claim-risk concerns.
Documentation
verified Multiple document types were used, including validation, monitoring, PDD, and issuance records, and extraction confidence is high.
missing Several important fields remain unstated, including buffer pool, usage monitoring method, and reversal detail, limiting documentary completeness.
Detailed Analysis
Integrity
The monitoring report dated 2024-10-10 shows an investment-test additionality case that was confirmed by the VVB, and it reports no material findings or corrective actions required. The project uses ACM0008 version 08.0, but the extracted record does not state a buffer pool percentage, and reversal events are listed as not addressed, which weakens permanence confidence. Leakage is a major weakness because the monitoring report says it was quantified, while the validation report says it was not addressed; I privileged the more recent monitoring report, but the contradiction still lowers reliability.
Transparency
The monitoring period and crediting period are clearly disclosed, and the VVB is named, which helps traceability. However, the extracted record does not state the usage monitoring method, claimed-versus-verified issuance comparison, or any baseline reassessment timing. The absence of these details limits MRV transparency even though the documentation set is relatively broad.
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces one major dual-channel claim risk. Still, the record lacks CCP status, and the missing usage-rate evidence plus the leakage contradiction create some over-crediting concern. Because the validation report and monitoring report disagree on leakage treatment, I relied on the later monitoring report for the score, but the inconsistency still depresses claim safety.
Documentation
The evidence set includes validation, monitoring, PDD, and issuance documents, and extraction confidence is high, which supports a decent documentation score. The monitoring report is recent relative to the crediting period and reports no material findings or corrective actions. Even so, several important items are not stated in the extracted record, including buffer pool, usage monitoring method, and reversal detail, so completeness is only moderate.
Overall
Overall, the project looks moderately credible on additionality and has a reasonably complete document set, but the score is held back by missing permanence and MRV details. I privileged the monitoring report over the older validation report where they conflicted, because it is more recent and project-specific, but I still penalized the score for the contradiction itself. The main reliability issues are the leakage disagreement and the shift from false to true on safeguards-related items between validation and monitoring records.
Audit Analysis
This is a methane utilization project with VVB-verified additionality and no material findings reported, which supports a moderate integrity score. However, several key items are missing or inconsistent across documents, especially leakage treatment, safeguards, and the handling of contradictions between the monitoring and validation/issuance records. The project is not CORSIA-eligible, but CCP status is not stated, so double-claim risk cannot be fully ruled out from the extracted record alone.
Project Description
Proponent: Huainan Huamei Pushi New Energy Technology Co., Ltd Protocol categories: Energy industries (renewable/non-renewable sources); Mining/mineral production Protocols: ACM0008 Estimated annual GHG reductions: 151088 tCO2e Region: Asia Registration date: 2024-11-16
Red Flags
- Leakage treatment is inconsistent across documents: the monitoring report says it was quantified, while the validation report says it was not addressed.
- Safeguards-related items were marked false in the validation report but true in the monitoring report, creating a reliability concern.
- No buffer pool percentage, reversal detail, or usage monitoring method was found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 9,250 | 9,250 | 0 | |
| 2022 | 71,186 | 71,186 | 0 | |
| 2023 | 34,683 | 26,260 | 8,423 | |
| Total | 115,119 | 106,696 | 8,423 |
Cosa migliorerebbe questo punteggio
- Publish a clear leakage assessment with the same treatment across validation, monitoring, and issuance documents, including any quantified deduction.
- Disclose the usage monitoring method, buffer pool or reversal handling, and CCP status to reduce claim and permanence uncertainty.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No buffer or reversal detail stated
Leakage treatment contradicted
Project baseline, reassessment not stated
Safeguards present but inconsistently documented
Not CORSIA-eligible; CCP status unstated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →