Vai al contenuto principale
CC avoidance El Salvador Vintage 2022 Solo marketplace General Methodology v2.0

Antares

CC-19

1.5 / 10
Integrity
2.0
Transparency
0.5
Claim Safety
2.0
Documentation
1.0

Score Breakdown

Integrity

missing Additionality, baseline approach, leakage treatment, and any findings/corrective actions were not found in the extracted record

inferred Project is labeled as renewable energy avoidance, but no supporting baseline or grid/emissions factor evidence is available

Transparency

missing No VVB/assurance information, monitoring period, or error checks were found in the extracted record

missing Registry/public-data completeness cannot be assessed because no evidence documents were provided

Claim Safety

missing CORSIA/CCP status and double-claim controls were not found in the extracted record

missing Over-crediting risk cannot be evaluated because baseline and any national/default factors were not provided

Documentation

missing No documents were used (0), so core claims are not auditable from the extracted record

missing Low extraction confidence reduces confidence that any missing items are truly absent versus unreadable

Detailed Analysis

Integrity

No project documents were available in the extracted record (0 documents used), so additionality testing, baseline method and reassessment timing, leakage deduction/justification, and any material findings or corrective actions cannot be confirmed. For an avoidance renewable energy project, the absence of baseline and grid emissions factor evidence materially undermines integrity assessment. With low extraction confidence, the risk that key integrity details are missing due to unreadable sources is also elevated.

Transparency

Transparency is very limited because no verification/assurance body, monitoring period, or monitoring methodology details were found in the extracted record. Without monitoring reports or verification statements, there is no way to check reported versus verified results or assess MRV rigor. Registry completeness cannot be evaluated beyond the provided registry code because no supporting documentation was included.

Claim Safety

Claim safety is weak due to the inability to substantiate the basis for avoided emissions (baseline and factors not provided) and the absence of eligibility/status information that affects marketing claims. CORSIA eligibility and CCP status were not found in the extracted record, so double-claim/dual-channel risk controls cannot be assessed. Overall, the lack of auditable evidence increases greenwashing and over-crediting risk.

Documentation

Documentation quality is very poor: the extracted record lists no evidence documents and indicates 0 documents were used. The minimum extraction confidence is low, implying at least one key source was poorly readable, which further reduces confidence in completeness. With no accessible PDD/monitoring/verification materials, the project is not independently auditable from the provided dataset.

Overall

With no contradictions reported, there are no cross-document discrepancies to resolve; however, the absence of any extracted documents dominates the assessment. Scores are conservatively low because core elements (additionality, baseline, leakage, MRV, and eligibility) were not found in the extracted record and extraction confidence is low. Note: per the stated gate rules, a documentation score below 3.0 would cap transparency post-scoring.

Audit Analysis

Only minimal project identifiers were provided, with no extracted content from official documents. As a result, additionality, baseline setting, leakage treatment, and MRV quality cannot be substantiated, creating high uncertainty and elevated over-crediting/greenwashing risk.

Project Description

Antares Renewable Energy Credits, generated from a 75.2MW Solar plant in Las Flores, El Salvador. Issued with IREC standard.

Red Flags

  • No official documents were available in the extracted record (0 documents used), preventing validation of baseline, monitoring, and verification claims
  • Low extraction confidence indicates at least one key document was poorly readable, further reducing reliability

Credit Vintages

Nessuna emissione registrata sul registro.

Il marketplace dichiara i vintage: 2022 (non verificato).

Cosa migliorerebbe questo punteggio

  • Provide the core I-REC documentation set (registration, methodology/baseline basis, monitoring reports, and any third-party assurance/verification statements) so baseline, MRV, and issuance can be audited
  • Disclose eligibility/claim controls (e.g., CORSIA/CCP status if applicable, ownership/retirement evidence, and measures to prevent double counting) and publish key monitoring parameters and results

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Avoidance type, but permanence provisions not evidenced

Leakage

Leakage treatment not found

Baseline

Baseline method not found

Safeguards

Safeguards/FPIC/grievance not found

Double-claim

CORSIA/CCP status not found

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Solo marketplace

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti