Artas Bundle Solar Project
#1508of 1935 in Renewable energy#38of 75 in TR#74of 154 in Intl. Carbon Registry (ICR)#1154of 1287 in ACM0002
Audit Analysis
The Artas Bundle Solar Project is a 5-year solar avoidance project in Turkey using a jurisdictional baseline and a combined additionality test, but the available record contains only the PDD and an appendix with no verification or monitoring report. The claimed emissions reductions (28,683 tCO₂e) represent roughly 66% of the pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, yet the absence of a named verification body and a verified ERR figure leaves the core integrity claims unconfirmed.
Red Flags
- No verification or monitoring report is present in the evidence set; the claimed ERR of 28,683 tCO₂e has no independent verification figure to corroborate it.
- No verification body (VVB) is named in any available document, and additionality verification status is not stated, leaving the combined additionality test unconfirmed.
- CORSIA eligibility and CCP status are both unstated, leaving double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 13,727 | 0 | 13,727 | |
| 2025 | 28,239 | 0 | 28,239 | |
| 2026 | 28,414 | 0 | 28,414 | |
| 2027 | 28,414 | 0 | 28,414 | |
| 2028 | 28,414 | 0 | 28,414 | |
| 2029 | 2,958 | 0 | 2,958 | |
| Total | 130,166 | 0 | 130,166 |
Risk Indicators
Combined test stated but unverified; no VVB named
no reversals reported
0% deduction, 'deemed negligible' without quantitative support
Jurisdictional method with 2022 grid EF; no reassessment date stated
FPIC conducted, grievance mechanism present, safeguards documented
CORSIA and CCP status both unstated; risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →