Aurá Landfill Gas Project
#28of 64 in Methane#48of 104 in Brazil#112of 213 in CDM (UNFCCC)#27of 53 in ACM0001
Audit Analysis
The Aurá Landfill Gas Project is a CDM landfill gas capture project in Brazil with VVB-confirmed additionality and a measured project-specific baseline, but it is undermined by inconsistent leakage treatment across monitoring reports, a very short two-month monitoring window, contradictory ERR figures, and the absence of FPIC, a grievance mechanism, or any documented safeguards. The project's integrity is further weakened by an open corrective action on the monitoring plan and a baseline last reassessed in 2005.
Red Flags
- ERR figures are contradictory: one monitoring report (Jan 2017) reports 135,373 tCO₂e while a later report (Mar 2017) reports 28,121 tCO₂e for what appears to be the same or overlapping period, a ratio of roughly 4.8× that cannot be reconciled without further context.
- Leakage treatment is inconsistent: the 2015 monitoring report states leakage was 'not addressed' while the 2017 report claims it was 'quantified' with a 0% deduction, raising questions about whether a genuine quantification was performed.
- No FPIC was conducted, no grievance mechanism is in place, and the 2017 monitoring report does not mention safeguards, despite the 2006 validation report having referenced them.
- One corrective action remains open: the monitoring plan must be revised to align with ACM0001 v4.01 and the actual site setup (single flow meter for both captured and flared gas).
- The monitoring period covers only 54 days (Jan 1 – Feb 24, 2017), providing a very narrow window to validate performance over a 10-year crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 83,789 | 0 | 83,789 | |
| 2010 | 170,672 | 0 | 170,672 | |
| 2011 | 234,835 | 0 | 234,835 | |
| 2013 | 768,509 | 0 | 768,509 | |
| 2014 | 429,046 | 0 | 429,046 | |
| 2015 | 646,805 | 0 | 646,805 | |
| 2016 | 274,745 | 0 | 274,745 | |
| 2017 | 171,002 | 0 | 171,002 | |
| Total | 2,779,403 | 0 | 2,779,403 |
Risk Indicators
VVB-confirmed combined test
No reversal events but no buffer data
0% deduction, inconsistent justification
Project-specific, last reassessed 2005
No FPIC, no grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.