Skip to main content
CDMLandfill gasBrazilACM0001

Aurá Landfill Gas Project

CDM-0888 ↗

#28of 64 in Methane#48of 104 in Brazil#112of 213 in CDM (UNFCCC)#27of 53 in ACM0001

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The Aurá Landfill Gas Project is a CDM landfill gas capture project in Brazil with VVB-confirmed additionality and a measured project-specific baseline, but it is undermined by inconsistent leakage treatment across monitoring reports, a very short two-month monitoring window, contradictory ERR figures, and the absence of FPIC, a grievance mechanism, or any documented safeguards. The project's integrity is further weakened by an open corrective action on the monitoring plan and a baseline last reassessed in 2005.

Red Flags

  • ERR figures are contradictory: one monitoring report (Jan 2017) reports 135,373 tCO₂e while a later report (Mar 2017) reports 28,121 tCO₂e for what appears to be the same or overlapping period, a ratio of roughly 4.8× that cannot be reconciled without further context.
  • Leakage treatment is inconsistent: the 2015 monitoring report states leakage was 'not addressed' while the 2017 report claims it was 'quantified' with a 0% deduction, raising questions about whether a genuine quantification was performed.
  • No FPIC was conducted, no grievance mechanism is in place, and the 2017 monitoring report does not mention safeguards, despite the 2006 validation report having referenced them.
  • One corrective action remains open: the monitoring plan must be revised to align with ACM0001 v4.01 and the actual site setup (single flow meter for both captured and flared gas).
  • The monitoring period covers only 54 days (Jan 1 – Feb 24, 2017), providing a very narrow window to validate performance over a 10-year crediting period.

Credit Vintages

IssuedRetiredAvailable
2009
83,789083,789
2010
170,6720170,672
2011
234,8350234,835
2013
768,5090768,509
2014
429,0460429,046
2015
646,8050646,805
2016
274,7450274,745
2017
171,0020171,002
Total2,779,40302,779,403

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No reversal events but no buffer data

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific, last reassessed 2005

Safeguards

No FPIC, no grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents