Vai al contenuto principale
PUR Alternative Materials Other United Kingdom Documentazione completa General Methodology v2.0

Avonmouth Production Facility

PUR-756292 ↗

4.3 / 10
Integrity
5.2
Transparency
3.6
Claim Safety
4.8
Documentation
2.8

Score Breakdown

Integrity

verified The verification report confirms additionality via an investment test and reports no material findings or corrective actions.

missing Leakage, baseline reassessment timing, and permanence/buffer provisions were not found in the extracted record, limiting confidence in the quantified outcome.

Transparency

verified A named VVB (350Solutions, Inc.) and a defined monitoring period (2024-10-01 to 2025-09-30) are provided in the verification record.

missing The extracted record lacks key MRV details (e.g., leakage deduction, usage monitoring method) and contains inconsistent reported results across documents.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk.

missing Conflicting verified removals values and missing leakage/baseline reassessment details increase over-crediting and greenwashing risk for public claims.

Documentation

verified A recent verification report date is provided (2025-12-19) and 12 documents were reportedly used in extraction.

missing Minimum extraction confidence is low and the evidence document list is not identifiable in the extracted record, reducing auditability.

Detailed Analysis

Integrity

The verification report indicates additionality was confirmed by the VVB using an investment test, and it reports no material findings and no corrective actions. However, the baseline is described only as project-specific and the timing of any baseline reassessment is not stated in the extracted record. Leakage treatment (deduction and justification) is also not stated, and permanence provisions such as a buffer pool or any reversal monitoring outcomes were not found in the extracted record, which weakens integrity confidence.

Transparency

The extracted verification record provides the VVB name (350Solutions, Inc.) and a clear monitoring period (2024-10-01 to 2025-09-30). At the same time, key MRV elements that would allow independent scrutiny—such as the leakage deduction, leakage justification, and the usage monitoring method—are not stated in the extracted record. Transparency is further reduced by inconsistencies across documents in the verified removals figure and by low extraction confidence.

Claim Safety

The project is explicitly not CORSIA-eligible, which lowers the risk of high-stakes aviation-related claims. Nonetheless, claim safety is constrained by missing leakage and baseline reassessment information in the extracted record, both of which are central to over-crediting risk in alternative materials methodologies. The presence of conflicting verified removals values across documents also increases the risk that external claims could rely on an inflated or outdated figure.

Documentation

A recent verification report date (2025-12-19) is available, and the extraction indicates 12 documents were used. However, the minimum extraction confidence is low, implying at least one key document was poorly readable, and the evidence document list is not identifiable beyond an 'unknown' entry in the extracted record. These gaps reduce traceability and make it difficult to validate key quantitative and safeguards-related assertions.

Overall

I privileged the more recent values where dates were provided: for verified removals I used 14,873 because it appears in the later-dated record (2024-12-27) rather than 20,831 (2024-08-05), and for the crediting period I used 2023-10-01 to 2024-09-30 (2024-12-27) rather than 2022-10-01 to 2023-09-30 (2024-08-05). For safeguards, the extracted record is contradictory (one document indicates safeguards were mentioned while a later-dated record indicates they were not), so I treated safeguards as not reliably evidenced and scored safeguards-related aspects conservatively. These contradictions, combined with low extraction confidence and missing leakage/permanence details, materially reduce confidence in the project’s reported outcome and therefore lower the overall score. Note: documentation is below 3.0, so a transparency cap may be applied downstream by the gate rules.

Audit Analysis

The verification report indicates additionality was assessed using an investment test and no material findings or corrective actions were reported. However, key integrity parameters (baseline reassessment timing, leakage treatment, permanence/buffer approach) are not stated in the extracted record, and low extraction confidence plus internal inconsistencies in reported figures reduce reliability. Overall, the project appears plausible but is not well-supported by extractable, consistent evidence for conservative credit-quality claims.

Project Description

PUR-756292 — Alternative Materials Other

Red Flags

  • Conflicting verified removals figures across documents (14,873 vs 20,831) create over-crediting and reporting reliability risk.
  • Safeguards are inconsistently reported (one document indicates safeguards mentioned; another indicates they were not), with no FPIC or grievance mechanism documented in the extracted record.
  • Leakage treatment and justification are not stated in the extracted record, despite being important for alternative materials accounting.
  • Low extraction confidence indicates at least one key document was poorly readable, weakening evidentiary strength.

Credit Vintages Exhausted

Issued Retired Available
2023
5,920 5,920 0
2024
13,774 13,774 0
2025
4,714 4,714 0
Total 24,408 24,408 0

Cosa migliorerebbe questo punteggio

  • Publish or clearly reference the underlying calculation annexes showing leakage treatment (deduction and justification), baseline parameters, and any reassessment schedule for the project-specific baseline.
  • Provide explicit safeguards documentation (stakeholder engagement, FPIC where relevant, and a grievance mechanism) and reconcile the conflicting verified removals and crediting-period statements across documents with a single, dated source of truth.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Buffer/reversal provisions not evidenced

Leakage

Leakage treatment not stated

Baseline

Project-specific; reassessment not evidenced

Safeguards

Safeguards/FPIC/grievance not evidenced

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti