Awa and Binwa Small Hydro Power Projects in Kangra District of Himachal Pradesh, India
#1348of 1935 in Renewable energy#723of 975 in India#1073of 1459 in CDM (UNFCCC)#435of 806 in AMS-I.D
Audit Analysis
A CDM small-hydro project with a verified investment additionality test and a standard jurisdictional grid baseline, but undermined by a 10× discrepancy in the claimed emission reduction figure between the PDD and the validation report, the absence of any verified monitoring data, and multiple material findings at validation (including an initially omitted diesel generator from the project boundary). The project's crediting period (2012–2022) has expired, and no post-validation performance data is available in the extracted record.
Red Flags
- 10× discrepancy in total ERR: the PDD (2011-12-20) states 302,010 tCO₂e while the validation report (2011-12-22) states 30,201 tCO₂e — a factor-of-ten difference that cannot be reconciled from the available documents
- Diesel generator sets were initially omitted from the project boundary and had to be added in the revised PDD, indicating the original baseline and boundary were incomplete
- No verified monitoring-period emission reductions are available; total_err_verified is not stated in any extracted document
- Multiple investment-analysis corrections (IRR, depreciation, WACC, working capital) were required before validation could be completed, raising questions about the robustness of the additionality case
- Low extraction confidence across the document set, meaning key figures may have been misread or missed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deemed negligible, appropriate for grid feed-in
Jurisdictional grid EF, standard CDM approach
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in extracted record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →