AWMS Methane Recovery Project BR06-S-25, Minas Gerais, Brazil
#78of 104 in Brazil#180of 213 in CDM (UNFCCC)#47of 62 in AMS-III.D
Audit Analysis
A CDM methane recovery project in Minas Gerais with confirmed additionality (combined test, DNB-verified) and a standardized methodology (AMS III.D v11), but significant gaps in leakage treatment, a project-specific modeled baseline, and a large unexplained discrepancy between claimed and verified emissions reductions that raises data-reliability concerns. The project carries moderate over-crediting risk due to the leakage gap and baseline conservatism questions flagged during validation.
Red Flags
- Leakage is explicitly not addressed in the available documents, with no deduction or justification stated — a material gap for a methane capture project
- Verified ERR (282,217 tCO2e) is approximately 20× the claimed ERR (14,230 tCO2e) for the monitoring period, indicating either a severe ex-ante underestimation or a data/unit error that undermines confidence in the credit quantity
- 17 material findings (CARs and CRs) during validation raised questions about baseline calculation, solid separator treatment, and project emissions monitoring, with 5 corrective actions required before registration
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 17,367 | 0 | 17,367 | |
| 2012 | 13,867 | 0 | 13,867 | |
| Total | 31,234 | 0 | 31,234 |
Risk Indicators
Combined test, DNV-verified
No buffer pool or reversal data stated
Not addressed, no deduction or justification
Project-specific, modeled, questioned in validation
Safeguards mentioned, benefit sharing described, FPIC not st
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →