AWMS Methane Recovery Project BR06-S-29, Sao Paulo, Brazil
#57of 104 in Brazil#131of 213 in CDM (UNFCCC)#26of 62 in AMS-III.D
Audit Analysis
A CDM methane-avoidance biodigester project in São Paulo with a VVB-confirmed combined additionality test, but significant gaps in leakage treatment, permanence safeguards (no buffer pool), and a notable under-delivery of roughly 43% of the pro-rata ex-ante expectation for the monitored period. Five corrective actions were raised during validation, including a mismatch between biodigester commissioning and the crediting start date, which weakens confidence in the baseline and additionality claims.
Red Flags
- Leakage is explicitly not addressed in the monitoring report, a material gap for a methane-avoidance project where displaced gas could be released elsewhere
- No buffer pool or permanence mechanism is documented despite inherent reversal risk if the biodigester ceases operation
- Verified ERR of 13,891 tCO2e for the 17-month monitoring period is only ~43% of the pro-rata expectation (~32,300 tCO2e) derived from the validation report's 228,194 tCO2e lifetime estimate, suggesting possible over-crediting in the ex-ante baseline
- Five corrective actions were raised at validation, including a mismatch between biodigester implementation and the crediting start date (CAR 4), raising questions about whether the project was fully operational when credits began accruing
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 13,891 | 0 | 13,891 | |
| 2013 | 11,769 | 0 | 11,769 | |
| Total | 25,660 | 0 | 25,660 |
Risk Indicators
Combined test, VVB-confirmed (DNV)
No buffer pool; inherent reversal risk if biodigester stops
Explicitly not addressed in monitoring report
Project-specific, modeled; no reassessment data; 43% pro-rat
Safeguards mentioned but FPIC and grievance mechanism not do
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →