Skip to main content
CDMMethane avoidanceMexicoAMS-III.D

AWMS METHANE RECOVERY PROJECT K1

CDM-5672 ↗

#29of 47 in Mexico#1222of 1459 in CDM (UNFCCC)#67of 105 in AMS-III.D

4.3/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The AWMS Methane Recovery Project K1 in Mexico is a CDM methane-avoidance project with a confirmed investment-test additionality assessment by TÜV SÜD, but it suffers from a severe 7× discrepancy between the PDD and validation report on claimed emissions reductions, no buffer pool or permanence mechanism for a methane project, and a contradictory leakage justification. No monitoring or verification data is available, and the low extraction confidence across six documents limits the reliability of the overall assessment.

Red Flags

  • Claimed ERR differs by a factor of ~7 between the PDD (410,120 tCO₂e) and the validation report (58,589 tCO₂e), indicating a major overstatement in the project's own documentation
  • No buffer pool or permanence mechanism is documented for a methane recovery project, leaving reversal risk unaddressed
  • Leakage justification is contradictory: the validation report states it was 'not addressed' while an appendix describes it as 'quantified', despite a 10% deduction being applied
  • No monitoring period, verified ERR, or verification report is available in the extracted record
  • Low extraction confidence across all six source documents reduces reliability of the data

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal risk unaddressed

Leakage

10% deduction but contradictory justification

Baseline

Project-specific modeled baseline; no reassessment data

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents