AWMS Methane Recovery Project MX06-S-64, Coahuila and Durango, México
#15of 27 in Mexico#168of 213 in CDM (UNFCCC)#40of 62 in AMS-III.D
Audit Analysis
This 2007 CDM anaerobic waste management methane project in Mexico has a verified barrier-test additionality assessment by TÜV SÜD and a standardized AMS III.D. methodology, but the complete absence of any monitoring reports, verified emission reductions, or buffer pool data leaves the project's actual performance and permanence unverified. The project-specific modeled baseline and a deemed-negligible leakage claim without quantification introduce moderate over-crediting risk that cannot be assessed against any verified figures.
Red Flags
- No buffer pool or permanence mechanism identified for a methane destruction project, leaving reversal risk unaddressed
- Zero monitoring reports or verified emission reduction figures available despite a 10-year crediting period (2007–2017)
- Cow inventory discrepancy at Establo La Lagunita (1,200 vs 1,000 head) flagged in validation could affect baseline methane generation estimates
- Leakage deemed negligible without any quantified deduction or detailed justification in the available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified barrier test
No buffer pool identified
Deemed negligible, unquantified
Project-specific, modeled
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →