AWMS Methane Recovery Project MX06-S-99, Aguascalientes, Michoacan and Queretaro, México
#18of 27 in Mexico#174of 213 in CDM (UNFCCC)#45of 62 in AMS-III.D
Audit Analysis
This CDM methane-avoidance project in Mexico has a VVB-confirmed additionality assessment and a well-known verification body (DNV), but suffers from a severe under-delivery of emissions reductions (approximately 16% of the pro-rata expectation for the elapsed monitoring period), a contradiction in how leakage is treated across documents, and the absence of a buffer pool. The project-specific, modeled baseline and numerous missing data points further weaken confidence in the credit quality.
Red Flags
- Verified emissions reductions of 8,186 tCO2e over the 4-year monitoring period represent only ~16% of the pro-rata expectation (~52,400 tCO2e) derived from the 91,702 tCO2e lifetime estimate in the validation report — a major under-delivery that raises over-crediting risk for the full crediting period.
- Leakage treatment is contradictory: the validation report (2007) deems leakage negligible, but the monitoring report (2011) does not address leakage at all, leaving no quantified deduction or updated justification.
- No buffer pool is documented for this methane-avoidance project, meaning any project cessation would result in full re-emission of avoided methane with no credit retirement mechanism.
- Seven corrective action requests were raised during validation, including updating the electricity emission factor and ensuring consistency in emission projections over the 7-year crediting period, indicating initial design weaknesses.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
No buffer pool; re-emission risk on cessation
Contradictory treatment across documents
Project-specific, modeled, no reassessment date
Mentioned but FPIC and grievance mechanism undocumented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →