Bagasse based Co-generation Power Project at Khatauli
#70of 352 in Biomass#464of 975 in India#650of 1459 in CDM (UNFCCC)#11of 81 in ACM0006
Audit Analysis
A CDM bagasse co-generation project in India with VVB-confirmed additionality (barrier test by SGS UK), but undermined by multiple open corrective actions, a 0% leakage deduction with only a 'deemed negligible' justification, unaddressed feedstock sustainability, and four inter-document contradictions. The project is an avoidance-type (low permanence risk), yet the verification record shows significant gaps in monitoring detail and baseline justification that weaken confidence in the claimed credits.
Red Flags
- Seven open corrective actions remain, including missing transportation-emission monitoring for purchased bagasse and insufficient baseline scenario justification (Scenario H2 / heat generation not adequately addressed)
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, despite the project purchasing bagasse from outside sites
- Feedstock sustainability and carbon content of the bagasse are not stated in any available document, leaving the waste-claim unverified
- Four contradictions between the PDD, validation report, and monitoring reports (grid EF units, baseline method label, ERR figures, crediting period dates) reduce data reliability
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 59,267 | 0 | 59,267 | |
| 2012 | 50,776 | 0 | 50,776 | |
| 2013 | 28,312 | 0 | 28,312 | |
| Total | 138,355 | 0 | 138,355 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversal risk
0% deduction, 'deemed negligible' only
Project-specific, method label contradicts PDD
Safeguards mentioned, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.