Bagasse Based cogeneration power project of Rana Sugars Limited, Amritsar District, Punjab;
#114of 352 in Biomass#598of 975 in India#875of 1459 in CDM (UNFCCC)#374of 806 in AMS-I.D
Audit Analysis
A CDM bagasse cogeneration project with VVB-confirmed additionality but significant methodological concerns flagged by the verifier, including unsubstantiated baseline validity and leakage calculations. The project delivered only about 25% of its pro-rata expected emissions reductions in the first monitoring year, and key monitoring parameters remain unreported. The combination of four corrective action requests and a baseline-method contradiction between the validation and monitoring reports undermines confidence in the credit quality.
Red Flags
- CAR #4 in the monitoring report states the project proponent failed to demonstrate the validity of the original/current baseline — a fundamental integrity concern
- CAR #5 states the approach used to calculate leakage and project emissions was not substantiated, yet the project claims a 0% leakage deduction with a 'quantified' justification
- Baseline method is contradictory: the validation report (2009) records a jurisdictional baseline while the monitoring report (2010) records a project-specific baseline
- Verified ERR figure is not stated in any available document, making independent verification of actual emissions reductions impossible
- Only one year of monitoring data (2009–2010) is available for a seven-year crediting period ending in 2016
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 152,276 | 0 | 152,276 | |
| Total | 152,276 | 0 | 152,276 |
Risk Indicators
VVB-confirmed barrier test
no reversal events (energy project)
0% deduction; VVB found approach unsubstantiated
Method contradictory; CAR #4 questions validity
Safeguards and benefit sharing mentioned; FPIC and grievance
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →