BAITANG AONONG SWINE FARM COMPOSTING PROJECT
Score Breakdown
Integrity
verified The validation report (2023-07-17) confirms additionality using an investment test.
missing Baseline is project-specific and the timing of any baseline reassessment was not found in the extracted record; leakage is also not addressed.
Transparency
verified A named VVB is provided (CTI Certification Co., Ltd.) and multiple document types are referenced (validation report and stakeholder consultation).
missing Monitoring period and verified/claimed ER totals were not found in the extracted record, preventing cross-checks of MRV results.
Claim Safety
missing Leakage is not addressed in the extracted record, and there is no stated leakage deduction, elevating over-crediting/claim risk.
inferred CORSIA eligibility and CCP status were not found in the extracted record, so downstream claim constraints cannot be confirmed.
Documentation
verified The extracted record includes a recent validation report (2023-07-17) and indicates stakeholder consultation plus safeguards elements (FPIC and grievance mechanism).
missing The validation report lists corrective actions related to a technology change and updated spreadsheets, and some key fields remain missing in the extracted record.
Detailed Analysis
Integrity
The validation report (2023-07-17) confirms additionality via an investment test, which is a stronger additionality basis than a purely qualitative barrier claim. The baseline is described as project-specific, and the timing of any baseline reassessment was not found in the extracted record, which weakens confidence in baseline robustness over the 2021–2031 crediting period. Leakage is explicitly not addressed in the extracted record (no justification and no deduction stated), which is a material integrity gap for a manure management/composting activity. No reversal buffer information was found in the extracted record; while reversal risk is typically lower than for sequestration projects, the absence of stated risk treatment still reduces robustness.
Transparency
The extracted record identifies the VVB (CTI Certification Co., Ltd.) and includes a stakeholder consultation document alongside the validation report, supporting basic transparency. However, the monitoring period and both claimed and verified emission reductions were not found in the extracted record, so the quality of MRV and the ability to reconcile calculations cannot be assessed. The record also does not provide usage monitoring details, which limits understanding of how activity data are tracked under the applied methodology.
Claim Safety
Over-crediting risk is elevated because leakage is not addressed in the extracted record and there is no stated leakage deduction, leaving uncertainty about whether any displaced emissions or indirect effects were considered. The extracted record does not state CORSIA eligibility or CCP status, so buyers cannot rely on those labels to reduce greenwashing risk. The validation report notes corrective actions tied to a technology change and updated calculation spreadsheets, which can be normal but increases the need for careful scrutiny of final credited quantities.
Documentation
Documentation is moderately strong because the extracted record includes a recent validation report (2023-07-17), references stakeholder consultation, and indicates safeguards elements such as FPIC and a grievance mechanism. At the same time, the validation report lists corrective actions required (technology change and modified project description/ER spreadsheet), suggesting earlier inconsistencies that needed resolution. Several key quantitative fields (monitoring period, ER totals, leakage deduction) were not found in the extracted record, indicating remaining evidence gaps. The minimum extraction confidence is medium, which is acceptable but not as strong as a fully high-confidence extraction.
Overall
No contradictions were listed in the extracted record, so there are no cross-document discrepancies to resolve. The overall score is pulled down mainly by missing MRV quantifications (no monitoring period and no verified/claimed ER totals found) and by leakage not being addressed, both of which increase over-crediting and claim risk. Positively, additionality is VVB-confirmed in the validation report and safeguards elements are indicated, supporting a mid-range overall assessment. Note: if documentation were to fall below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, the overall would be capped at 6.0 (not applied here).
Audit Analysis
The project has VVB-confirmed additionality via an investment test and reports no material findings in the validation record, which supports basic integrity. However, key quantifications needed to judge over-crediting risk (monitoring period, verified ERs, leakage treatment, and baseline reassessment timing) were not found in the extracted record, and the validation report notes corrective actions related to a technology change and updated calculations.
Project Description
Proponent: Guizhou Aonong Qihuan Animal Husbandry Co., Ltd Protocol categories: Livestock, enteric fermentation, and manure management; Waste handling and disposal Protocols: AMS-III.F. Estimated annual GHG reductions: 59776 tCO2e Region: Asia Registration date: 2024-02-05
Red Flags
- Leakage is not addressed in the extracted record (no justification and no stated deduction), increasing over-crediting risk.
- No verified emission reductions, monitoring period, or claimed ER totals were found in the extracted record, limiting the ability to assess MRV quality and crediting accuracy.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Publish/confirm the monitoring period(s) and provide a clear reconciliation of claimed vs verified emission reductions in the monitoring/verification documentation.
- Provide an explicit leakage assessment with justification and, if applicable, a quantified leakage deduction consistent with the methodology and project context.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal/buffer details found
Leakage not addressed
Project-specific baseline; reassessment timing unclear
FPIC and grievance mechanism documented
CORSIA/CCP status not found
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →