Baji River Stage I 10MW Run-of-river Hydropower Project

CDM-1498 ↗

#1450of 1935 in Renewable energy#904of 1084 in China#1192of 1459 in CDM (UNFCCC)#482of 806 in AMS-I.D

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A 10 MW run-of-river hydro project under CDM with a jurisdictional grid-emission-factor baseline and a reasonable 0% leakage assumption, but the available record lacks any monitoring or verification data, the additionality test is not explicitly documented, and a seven-fold discrepancy between the PDD and validation report on total emissions reductions raises material data-reliability concerns.

Red Flags

  • Seven-fold discrepancy in total ERR: the PDD (Aug 2015) states 204,813 tCO₂ while the validation report (Oct 2015) states 29,259 tCO₂; the cause of the gap is unexplained in the extracted record.
  • No monitoring reports or verification reports are present in the evidence set; the project's actual performance over its 7-year crediting period (2015–2022) is entirely unverified in the available documents.
  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving a core CDM requirement unconfirmed.
  • No FPIC, grievance mechanism, or benefit-sharing detail beyond a general flag is documented.

Credit Vintages

IssuedRetiredAvailable
2011
110,3930110,393
2012
43,922043,922
Total154,3150154,315

Risk Indicators

Additionality

Test type and VVB confirmation not stated in record

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible — appropriate for grid-connected hydro

Baseline

Jurisdictional grid EF baseline, standard for CDM hydro

Safeguards

Safeguards mentioned but no FPIC or grievance detail found

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents