VCSAgriculture Forestry and Other Land UseColombia Registry: RegisteredVM0006

Bajo Calima y Bahía Málaga (BCBM) REDD+ Project

VCS-1395 ↗

#64of 261 in Soil carbon#42of 124 in Colombia#577of 1339 in Verra (VCS)#4of 10 in VM0006

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The BCBM REDD+ project has a sound core design with VVB-confirmed additionality, a 10% buffer pool, and a quantified 20% leakage deduction, and has operated without reported reversal events since 2013. However, the verification record reveals an unusually high volume of nonconformities (33 VCS and 9 CCB NCRs), a material risk of double counting with grouped project 2298, and significant data-quality gaps in KML files and GHG calculation spreadsheets. The project's security context (illegal armed groups, coca production) adds operational risk and has limited transparency of the verification process.

Red Flags

  • Risk of double counting/claiming due to overlap with grouped project 2298 identified in the 2024 verification report; a Forward Action Request was raised but the overlap has not been definitively resolved.
  • 33 VCS nonconformity reports and 9 CCB NCRs were identified in the verification cycle, including missing GHG calculation formulae, ineligible areas in KML files, and incomplete biodiversity monitoring — all reportedly closed but indicating systemic documentation weaknesses.
  • The project did not undergo a CCB verification public comment period prior to verification, a procedural compliance gap.
  • Security concerns (illegal armed groups, coca production) limited communication of the verification process and are not fully reflected in the project risk section.
  • Buffer pool percentage is inconsistent across documents: 10% in the 2019 verification report versus 14% in the 2015 validation report.

Credit Vintages

IssuedRetiredAvailable
2013
225,935211,44114,494
2014
149,359107,70241,657
2015
366,210360,4045,806
2016
364,715364,7150
2017
364,162312,13452,028
2019
180,0000180,000
Total1,650,3811,356,396293,985

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Buffer pool present, no reversals, but security and NCR risks

Leakage

20% quantified deduction

Baseline

Project-specific, reassessment timing not stated

Safeguards

FPIC and grievance present, but extensive CCB findings and security opacity

Double-claim

CORSIA/CCP not stated; overlap risk with project 2298

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08VM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.