Skip to main content
CCLand use (AFOLU)ColombiaGeneral Methodologyv2.1

BAKA ROKARIRE ~IA TIR+~DITO

ECO-53 ↗

#39of 80 in ARR (afforestation)#100of 124 in Colombia#75of 99 in CerCarbono (CC)

4.3/ 10
Integrity
3.0
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A Colombian REDD+ project with VVB-confirmed additionality and a 15% buffer pool, but undermined by an unaddressed permanence concern ('No permanencia'), inconsistent leakage treatment across documents, and a baseline method contradiction between the validation and verification reports. The project delivered only ~55% of its pro-rata ex-ante expectation for the 2018–2020 monitoring period, and numerous community documentation gaps required corrective action.

Red Flags

  • Permanence explicitly stated as 'No permanencia' in the verification report while reversal events are marked as not addressed — a critical gap for a REDD+ project
  • Leakage deduction of 0% with the verification report stating the issue was 'not addressed' while the monitoring report claims it was 'deemed negligible' — no consistent justification across documents
  • Baseline method contradicted between the validation report (national default) and the verification report (jurisdictional), both dated 2022-02-11
  • Verified ERR (1,307,794 tCO2e at issuance) is only ~55% of the pro-rata ex-ante expectation (~2,358,655 tCO2e for 3 of 20 years), raising questions about the accuracy of the lifetime estimate
  • Numerous corrective actions (28+) related to community documentation, ERR corrections, and Taraira community registration gaps
  • Leakage not addressed in project documentation

Credit Vintages

IssuedRetiredAvailable
2018
74,756074,756
2019
72,295072,295
2020
83,736083,736
Total230,7870230,787

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Buffer pool present but 'No permanencia' stated

Leakage

0% deduction, justification inconsistent across docs

Baseline

Jurisdictional per VV but contradicted by validation

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents