Balsuyu Rooftop Bundled Solar Power Plants
#749of 1935 in Renewable energy#11of 75 in TR#16of 154 in Intl. Carbon Registry (ICR)#260of 806 in AMS-I.D
Audit Analysis
A small (<15 MW) grid-connected rooftop solar project in Turkey validated under ICR with a standard jurisdictional baseline and VVB-confirmed additionality. The methodology is sound for a renewable-energy avoidance project, but the documentation record is weakened by numerous corrective actions, material findings, and a low extraction confidence rating. No monitoring-period data is available, so all ERR figures remain ex-ante estimates.
Red Flags
- Ten corrective action requests (CAR9–CAR18) indicate significant gaps in the PDD, including missing data-quality chapter, missing risk-assessment chapter, broken regulatory links, and inconsistent financial parameters for the additionality analysis.
- Five material findings in the validation report, including an inconsistency in the annual ER value between the validation report (5,447) and the PDD (5,448), and local-stakeholder-consultation photos that lack proof they relate to this specific project.
- No monitoring-period data is available; the claimed, verified, and ex-ante lifetime ERR figures are all identical (54,474 tCO₂e), meaning no actual generation or emission-avoidance data has been independently verified against the ex-ante estimate.
- Low extraction confidence across the document set, suggesting at least one key document was poorly readable or incomplete.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 324 | 0 | 324 | |
| 2021 | 5,448 | 0 | 5,448 | |
| 2022 | 5,448 | 0 | 5,448 | |
| 2023 | 5,448 | 0 | 5,448 | |
| 2024 | 5,448 | 0 | 5,448 | |
| 2025 | 5,448 | 0 | 5,448 | |
| 2026 | 5,448 | 0 | 5,448 | |
| 2027 | 5,448 | 0 | 5,448 | |
| 2028 | 5,448 | 0 | 5,448 | |
| 2029 | 5,448 | 0 | 5,448 | |
| 2030 | 5,118 | 0 | 5,118 | |
| Total | 54,474 | 0 | 54,474 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, low inherent risk
0% justified as negligible (grid-connected)
Jurisdictional grid EF, standard method
FPIC & grievance present; EIA link broken, LSC photos unverified
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →