Bandai Hills Bamboo Reforestation Project, Ghana

VCS-2929 ↗

5.3 / 10
Integrity
6.1
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Score Breakdown

Integrity

verified Additionality confirmed by the VVB in the validation report (barrier test, TÜV NORD CERT GmbH, validation report 2024-02-27).

missing Leakage deduction of 0% and 'reversal events' flagged as not addressed in some documents; fire risk is described (validation report) indicating unresolved permanence risk.

Transparency

verified VVB named (TÜV NORD CERT GmbH) and recent validation report dated 2024-02-27 available.

missing Core MRV numbers are missing from extracted records (total emissions reductions claimed/verified not found), and there are contradictions between PDD and validation report on multiple fields.

Claim Safety

verified Project uses an approved VCS AR methodology (AR-ACM0003 version 2.0.0) and includes a 10% buffer pool.

missing Project-specific baseline with no recorded reassessment and contradictory leakage justification raise over-crediting risk (PDD vs validation report).

Documentation

verified Recent validation report (2024-02-27) and multiple documents listed (PDD, validation report, unknown document), n_docs_used = 9.

inferred Extraction confidence is medium, and several key fields are null or not stated (ERR figures, grid EF, reassessment), reducing documentation quality.

Detailed Analysis

Integrity

Additionality is supported by a barrier test and confirmed by the VVB in the validation report (TÜV NORD CERT GmbH, validation report 2024-02-27). The project uses VCS AR-ACM0003 and holds a 10% buffer pool, which is positive for permanence. However, reversal risk from uncontrolled fires is explicitly described in the validation report, while the extracted reversal_events field indicates reversals are 'not addressed' — a material gap. Leakage is assigned a 0% deduction and described as 'deemed negligible' in the validation report but is inconsistent with the PDD, which undermines reliability of leakage treatment.

Transparency

A named VVB and a recent validation report increase transparency; monitoring and crediting periods are provided. Nonetheless, essential MRV outputs such as total emissions reductions claimed and verified are not found in the extracted record. The merged record contains contradictions across documents (see overall) and a medium extraction confidence, reducing certainty about what is publicly documented.

Claim Safety

Use of an approved methodology and a buffer pool lower greenwashing risk, but a project-specific baseline without evidence of reassessment and contradictory leakage treatment raise over-crediting concerns. CORSIA/CCP status is not stated, so double-claim risk cannot be excluded. The contradictions in FPIC/grievance and safeguards timing also weaken confidence in safe claims.

Documentation

Documentation includes a recent validation report (2024-02-27) and multiple source documents (PDD, validation report, plus unknown). Nine documents were used in extraction, but extraction confidence is medium. Several fields are null or not stated (total ERR claimed/verified, grid emission factor, baseline reassessment), and there are outstanding contradictions that suggest documents were updated at different times.

Overall

I privileged the validation report (validation_report dated 2024-02-27) where contradictions exist because it is the most recent and is a higher-priority independent assessment; this was used to score additionality, leakage justification, FPIC/grievance presence, safeguards, and benefit-sharing. Contradictions addressed: (1) additionality: validation report lists barrier while another source lists combined — I privileged barrier (validation report 2024-02-27); (2) leakage: validation report says deemed negligible and 0% deduction while PDD lists not addressed — I privileged the validation report but penalized scores for inconsistency; (3) FPIC/grievance/safeguards/benefit-sharing: validation report records these as conducted/described while older/unknown docs do not — I privileged the validation report but note the inconsistency in earlier records; (4) crediting period: validation report gives 2021–2041 while PDD gives 2022–2042 — I privileged the validation report as most recent. These contradictions reduce confidence and therefore lowered transparency, claim safety and documentation scores despite positives. Overall weighted score (integrity 0.35, transparency 0.25, claim safety 0.25, documentation 0.15) yields 5.3.

Audit Analysis

The project has a validated additionality test (barrier) and a 10% buffer which support integrity, but several gaps and contradictions in key areas (leakage treatment, baseline reassessment, and reversal handling) reduce confidence. Documentation includes a recent validation report (2024) and a named VVB, but missing quantified MRV outputs and some contradictory PDD entries lower transparency and claim safety.

Project Description

Proponent: EcoPlanet Bamboo Group, LLC Protocol categories: Agriculture Forestry and Other Land Use Protocols: AR-ACM0003 Estimated annual GHG reductions: 188926 tCO2e Region: Africa Registration date: 2024-03-15

Red Flags

  • Contradictory records on leakage treatment: validation report states leakage deemed negligible with 0% deduction but PDD suggests leakage not addressed.
  • Reversal risk noted (uncontrolled fires) but the field for reversal events is listed as not addressed in extracted record.
  • Key MRV figures (total emissions reductions claimed/verified) are not present in available documents.

Credit Vintages

Nessuna emissione registrata sul registro.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

buffer present but fire reversal risk

Leakage

0% deduction but contradictory documentation

Baseline

project-specific baseline; reassessment unclear

Safeguards

FPIC and grievance documented (validation report)

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti