Baofeng County Waste Heat Recovery for Power Generation
#146of 202 in Industrial#169of 204 in China#170of 213 in CDM (UNFCCC)#15of 17 in ACM0004
Audit Analysis
A CDM waste-heat-recovery project for a cement plant with a verified combined additionality test, but significant baseline validity concerns: the monitoring report revealed the electricity is supplied captive to the cement plant rather than exported to the grid as described in the PDD, the grid emission factor dates to 2005, and leakage is treated as 0% with contradictory justifications across documents. The ERR figures in the two key documents (41,244 vs 436,120 tCO₂e) are on different bases (monitoring period vs lifetime estimate), but the discrepancy was not clearly reconciled in the extracted record.
Red Flags
- Material finding: electricity is supplied directly to the cement plant (captive), not delivered to the grid as described in the PDD — this fundamentally changes the baseline scenario and was only clarified during validation (CL 1, CL 6).
- Leakage justification is contradictory: the validation report (2008) states leakage is 'deemed negligible' while the monitoring report (2010) records it as 'not addressed'; the 0% deduction lacks a consistent, documented rationale.
- Grid emission factor of 0.9746 tCO₂/MWh is from 2005, making the baseline reference value over a decade old at the time of the monitoring report.
- No buffer pool or permanence mechanism is documented for this project, leaving no safeguard against potential reversal of credits.
- Equipment capacities (boilers, turbine, generator) changed from the registered PDD specifications, and meter accuracy classes and calibration frequencies differ from what was originally approved.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 41,088 | 0 | 41,088 | |
| Total | 41,088 | 0 | 41,088 |
Risk Indicators
VVB-confirmed combined test
No buffer pool; no reversal events reported
0% deduction; contradictory justification across documents
Project-specific; 2005 grid EF; captive-vs-grid shift
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →