Batavo Cooperativa Agroindustrial: Greenhouse emission reductions on swine production by means the installation of better waste management systems
#1098of 1329 in Industrial#158of 211 in Brazil#1322of 1459 in CDM (UNFCCC)#82of 105 in AMS-III.D
Audit Analysis
A CDM biogas project on swine waste in Brazil with a VVB-confirmed barrier additionality test and a 10% leakage deduction, but undermined by a 7-fold discrepancy between the PDD's claimed emissions reductions (59,276 tCO₂e) and the validated figure (8,468 tCO₂e), a project-specific modeled baseline with no reassessment record, and a complete absence of monitoring-period data. The low extraction confidence and lack of any post-validation documentation further limit confidence in the project's ongoing performance.
Red Flags
- The PDD claimed 59,276 tCO₂e in lifetime reductions while the validation report validated only 8,468 tCO₂e — a roughly 7-fold over-claim that was resolved downward during validation, indicating the initial project design was significantly overstated.
- No monitoring-period data, verified ERR figures, or FNRB values were found in any available document, leaving the project's actual performance entirely unverified.
- No buffer pool or permanence mechanism is documented for a project whose biogas capture infrastructure could fail, creating unaddressed reversal risk.
- The leakage treatment is contradictory: the PDD describes it as quantified while the validation report records it as not addressed, despite a 10% deduction being applied.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
10% deduction but contradictory justification
Project-specific, modeled, no reassessment
Safeguards mentioned, benefit sharing described, FPIC not st
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →