Bazhuahe and Yingpanhe Bundled Small Hydropower Project

CDM-4152 ↗

#175of 1935 in Renewable energy#53of 1084 in China#105of 1459 in CDM (UNFCCC)#62of 806 in AMS-I.D

6.4/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.5
Documentation
6.5

Audit Analysis

A CDM small hydropower project in China with a solid jurisdictional baseline (grid emission factor) and VVB-confirmed investment additionality. The project over-delivered relative to its ex-ante estimate during the monitoring period, but three corrective action requests during validation raised questions about PDD financial and technical rigour. Several key MRV parameters (FNRB, usage monitoring method) are not stated in the available record.

Red Flags

  • Three corrective action requests (CARs) during validation flagged inconsistencies between the PDD's FIRR and IRR calculation sheets, missing sensitivity analysis, and incomplete tariff comparisons for comparable hydro projects in the same province since 2002
  • Contradiction in leakage treatment: the monitoring report states leakage was 'deemed negligible' while an appendix references a 'quantified' approach, creating ambiguity about whether leakage was actually calculated
  • Crediting period dates differ between the validation report (2011-03-01 to 2018-02-28) and the monitoring report (2010-12-23 to 2017-12-22), raising questions about which period governs credit issuance

Credit Vintages

IssuedRetiredAvailable
2013
47,837047,837
2015
96,864096,864
Total144,7010144,701

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, minor doc inconsistency

Baseline

Jurisdictional grid EF (2009)

Safeguards

Mentioned, benefit sharing described, FPIC/grievance not sta

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents