Beijing Huadian Changping 12.8 MWp Photovoltaic Power Project
#1539of 1935 in Renewable energy#987of 1084 in China#1323of 1459 in CDM (UNFCCC)#522of 806 in AMS-I.D
Audit Analysis
A 12.8 MWp grid-connected solar PV project in Beijing validated under CDM with a jurisdictional baseline and VVB-confirmed additionality, but the available record is limited to the validation stage with no monitoring or verification reports. A significant discrepancy between the PDD's lifetime emission reduction estimate (101,255 tCO₂) and the validation report's figure (14,465 tCO₂) raises data-reliability concerns, and nine material findings at validation indicate a weak initial documentation baseline. The project type (renewable electricity) carries inherently low permanence and leakage risk, but the absence of post-validation data prevents any assessment of actual delivery.
Red Flags
- ERR contradiction: the PDD (Dec 2012) states a total of 101,255 tCO₂ while the validation report (Dec 2012) records 14,465 tCO₂ — a roughly 7× gap that is not explained in the available documents
- Nine material findings (CL 1–CL 9) and one corrective action (CAR 1) were raised at validation, covering missing LoA/MoC, absent plant specifications, missing monitoring parameters, and unclear meter-failure procedures
- No verification or monitoring reports are present in the extracted record, so actual credit issuance and delivery cannot be confirmed
- Extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed (ERM)
Avoidance type – no reversal risk
0% deemed negligible; justification inconsistent across docs
Jurisdictional (grid EF 0.9, 2012)
Mentioned; benefit sharing described; FPIC and grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →