Bethlehem Authority Improved Forest Management Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined test rather than relying on a single weak screen.
missing The latest monitoring report required 11 corrective actions, and the record contains contradictions on additionality, leakage, and reversal-related statements.
Transparency
verified The project has a named VVB, a defined monitoring period, and claimed and verified issuance volumes are both stated in the record.
missing No usage monitoring method is stated, and the latest record does not show a baseline reassessment date or full public-facing MRV detail.
Claim Safety
verified Leakage is quantified with a small deduction of 0.2%, which is better than leaving leakage unaddressed.
missing The project is not CORSIA-eligible, and contradictions in credited volume and leakage treatment weaken confidence in over-crediting risk.
Documentation
verified The extracted record draws on multiple official document types, including validation, monitoring, PDD, and issuance materials.
missing Eleven corrective actions were required, and the record shows conflicting statements across documents, even though extraction confidence is high.
Detailed Analysis
Integrity
The project has some positive integrity signals: the VVB, Aster Global Environmental Solutions, confirmed additionality, the baseline is project-based, and the latest monitoring report reports no reversal events and a 10% buffer pool. At the same time, the latest monitoring report required 11 corrective actions, and the record contains contradictions on additionality test type, leakage treatment, and reversal-related statements, which weakens confidence in the robustness of the crediting basis.
Transparency
Transparency is moderate because the record includes a monitoring period, a named verifier, and matching claimed and verified issuance totals in the latest record. However, the usage monitoring method is not stated in the extracted documents, and no baseline reassessment date is found, so the MRV trail is incomplete.
Claim Safety
Claim safety is mixed. The project is not CORSIA-eligible, which reduces dual-market claim risk, and leakage is quantified at 0.2% with a stated justification. Still, contradictions in the credited volume between validation documents and the older leakage treatment, plus the absence of a usage monitoring method, leave residual over-crediting concern.
Documentation
Documentation quality is fairly good because the extracted record spans validation, monitoring, PDD, and issuance documents, and extraction confidence is high. Even so, the latest monitoring report lists 11 corrective actions, and several fields conflict across documents, so the documentation is not fully clean or internally consistent.
Overall
The project looks better documented than many forest projects, but the evidence is not fully stable because the merged record contains several direct contradictions. I privileged the most recent documents for additionality, leakage, safeguards, and reversal status because they are later and more operationally specific, while noting that older validation figures show a lower credited volume and different leakage treatment. Those contradictions reduce reliability and keep the overall score in the mid range.
Audit Analysis
This is a registered VCS forest project with a VVB-confirmed additionality assessment, a quantified leakage deduction, and no reported reversals in the latest monitoring record. However, the record shows multiple contradictions across documents, a long crediting period with no reassessment date found, and weak social safeguard evidence in the latest monitoring report, which limits confidence in the claims.
Project Description
Proponent: Bethlehem Authority Protocol categories: Agriculture Forestry and Other Land Use Protocols: VM0003 Estimated annual GHG reductions: 21770 tCO2e Region: North America Registration date: 2020-04-06
Red Flags
- Multiple contradictions across documents on additionality, leakage treatment, safeguards, and credited volume reduce reliability.
- The latest monitoring report shows no FPIC and no grievance mechanism, and 11 corrective actions were required.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 22,027 | 22,027 | 0 | |
| 2013 | 24,589 | 24,589 | 0 | |
| 2014 | 26,466 | 26,466 | 0 | |
| 2015 | 32,401 | 32,401 | 0 | |
| 2016 | 12,887 | 12,887 | 0 | |
| 2017 | 32,393 | 32,393 | 0 | |
| 2018 | 33,668 | 33,668 | 0 | |
| 2019 | 20,745 | 20,745 | 0 | |
| 2020 | 28,785 | 28,785 | 0 | |
| 2021 | 31,464 | 656 | 30,808 | |
| Total | 265,425 | 234,617 | 30,808 |
Cosa migliorerebbe questo punteggio
- Publish a reconciled document trail explaining the contradictions in credited volume, leakage treatment, and safeguard statements, with a clear hierarchy of which document governs each value.
- Add a documented usage monitoring method, baseline reassessment date, and explicit social safeguards evidence including FPIC, grievance mechanism, and benefit-sharing details.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed but contradictory history
Buffer pool present, no reversals reported
Quantified leakage deduction
Project baseline, reassessment not stated
FPIC and grievance mechanism absent
Not CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
Other
validation
- VERIF_REP_1060_01JAN2016_31DEC2016.pdf
- Bethlehem Authority 2020 Verification Report 20211019.pdf
- Bethlehem Authority 2019 Verification Representation 20201208.pdf
- VERIF_STA_1060_01JAN2018_31DEC2018.pdf
- VERIF_STA_1060_29MAY2012_31DEC2012.pdf
- 051_03-Bethlehem_VCS__2016_Verification_Representation_Final.pdf
- +18 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →