Skip to main content
VCSEnergy demandRwanda Registry: RegisteredVMR0006

Better cooking for a better health In Rusizi district - Rwanda

VCS-4585 ↗

#89of 139 in Rwanda#1054of 1339 in Verra (VCS)#83of 103 in VMR0006

4.3/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A VCS cookstove project in Rwanda that passed validation with an investment-test additionality assessment confirmed by the VVB and a quantified 5% leakage deduction, but the validation process surfaced 27 corrective actions covering methodology applicability, emission-factor parameters, and stakeholder consultation. No monitoring data or verified emission reductions exist yet, the baseline is project-specific with no reassessment date, and the assumed 100% usage rate remains unverified. The project is registered but still in its early crediting period, so long-term performance cannot yet be assessed.

Red Flags

  • 27 corrective actions were required during validation, including incorrect ER calculation equations, incomplete NCV parameter tables, and insufficient fNRB justification — indicating a weak initial design that was only remediated at the validation stage
  • Usage rate is assumed at 100% with no verified field data; the monitoring report has not yet been produced
  • Low extraction confidence across the document set limits the reliability of the structured data used for scoring

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

Grievance mechanism present, FPIC unstated

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08VMR0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents