Biogas and biomass based co-generation project at CDBL
#27of 268 in Biogas#296of 975 in India#404of 1459 in CDM (UNFCCC)#209of 806 in AMS-I.D
Audit Analysis
A CDM biogas co-generation project in India with VVB-confirmed additionality and no over-crediting (81% of pro-rata expectation delivered), but undermined by a baseline-method contradiction between the PDD and the monitoring report, a 0% leakage deduction with inconsistent justification across documents, and the absence of any buffer pool or safeguards documentation. The project is functional but carries moderate data-reliability risk.
Red Flags
- Baseline method is stated as 'jurisdictional' in the 2008 PDD but 'project' in the 2022 monitoring report — a fundamental definitional contradiction that undermines baseline credibility
- Leakage justification shifts from 'deemed negligible' (2011 monitoring report) to 'quantified' (2022 monitoring report) while the deduction remains 0%, creating an internal inconsistency
- No buffer pool percentage, no reversal-event data, and no FPIC or grievance-mechanism documentation found in any available record
- Grid emission factor of 0.793 tCO2e/MWh is anchored to 2006 data; no updated or reassessed value is documented
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 12,096 | 0 | 12,096 | |
| 2010 | 23,449 | 0 | 23,449 | |
| 2011 | 21,890 | 0 | 21,890 | |
| 2012 | 33,728 | 0 | 33,728 | |
| 2015 | 31,209 | 0 | 31,209 | |
| 2023 | 71,430 | 0 | 71,430 | |
| Total | 193,802 | 0 | 193,802 |
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
0% deduction, inconsistent justification
Method contradicts between PDD and MR
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →