Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalIndia Registry: RegisteredAMS-III.D

Biogas to electricity generation group project in India

VCS-4245 ↗

#93of 268 in Biogas#562of 975 in India#698of 1339 in Verra (VCS)#32of 105 in AMS-III.D

5.0/ 10
Integrity
5.3
Transparency
4.8
Claim Safety
5.2
Documentation
4.2

Audit Analysis

A registered VCS biogas-to-electricity group project in India with a confirmed barrier-test additionality assessment and a reputable VVB (TÜV SÜD), but undermined by five material findings at validation—including a fundamental digester-type inconsistency (UASB vs KVIC) and an initially misdescribed baseline scenario. The project claims the lower, verified ERR figure (146,040 tCO₂e) rather than the higher PDD estimate (175,971), which is a positive signal, yet the monitoring period, leakage deduction percentage, and several key MRV parameters remain unstated in the available record.

Red Flags

  • Digester type inconsistency (UASB vs KVIC) between the PDD and the actual site, flagged as a material finding in the 2024 validation report, undermines confidence in the technical basis of the emission reduction calculation.
  • The PDD states a total ERR of 175,971 tCO₂e while the 2024 validation report confirms 146,040 tCO₂e—a roughly 17% discrepancy that, although resolved in favour of the lower figure, signals weak initial documentation quality.
  • Five material findings and five corresponding corrective actions were required at validation, including missing supporting documents for technical specifications and missing data units for key parameters (DCH4, UFb, MCFj, MS%BL,j).
  • The monitoring period is not stated in any available document, making it impossible to verify whether the 146,040 tCO₂e figure covers a single reporting period or the full seven-year crediting period.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

No storage; non-permanence N/A

Leakage

Quantified but deduction % unstated

Baseline

Project-specific, modeled, no reassessment date

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-III.D version 21.0 and AMS-I.F version 5.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents