Skip to main content
PURBiochar, 2022CanadaGeneral Methodologyv2.1

BioLesna Carrot River

PUR-392654 ↗

#15of 61 in Biochar#6of 16 in Canada#35of 111 in Puro.earth (PUR)

5.0/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

BioLesna Carrot River is a Canadian biochar project verified by 350Solutions under Puro.earth's 2022 methodology. Additionality is confirmed via an investment test and no reversal events have occurred, but the verification report flagged three material findings (unclear dry-mass protocol, spreadsheet discrepancies, inconsistent moisture values) with corrective actions still required. Leakage is neither quantified nor justified, and the project-specific baseline lacks a documented reassessment date, leaving moderate residual risk on the integrity and claim-safety dimensions.

Red Flags

  • Three material findings in the verification report (2025-02-27) require corrective action: unclear dry-mass calculation protocol, discrepancies between biochar production/sales spreadsheets, and inconsistent moisture content values for Euse.
  • Leakage deduction and justification are both absent from the extracted record; no quantified treatment is documented for a project type where displaced soil carbon or feedstock sourcing could generate leakage.
  • No buffer pool percentage is stated in any available document, leaving permanence risk unmitigated by a standardised safety margin.
  • Permanence claim not stated in available documents

Credit Vintages Exhausted

IssuedRetiredAvailable
2025
1001000
Total1001000

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals but no buffer pool stated

Leakage

Not quantified or justified

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents