Skip to main content
CDMBiomass EnergyIndiaAMS-I.D

Biomass based power generation project by Maharashtra Vidhyut Nigam Limited

CDM-5542 ↗

#175of 352 in Biomass#763of 975 in India#1142of 1459 in CDM (UNFCCC)#464of 806 in AMS-I.D

4.5/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A CDM biomass power generation project validated by TÜV NORD CERT with a confirmed investment-test additionality and a standard jurisdictional grid baseline. However, the validation report records 18 material findings spanning fuel mix, boiler efficiency, cost assumptions, and a methodology-version expiration issue, and no monitoring or verification data is available to confirm actual delivery. The low extraction confidence and absence of post-validation records limit confidence in the project's ongoing integrity.

Red Flags

  • 18 material findings (CAR A1–B16 plus methodology-expiration issue) in the validation report indicate the initial PDD contained widespread calculation and description errors before VVB correction
  • The applied methodology version (AMS I.D ver.17) was flagged by the EB as expired at the time of submission; the DOE argued the submission predated the expiration deadline, but this remains an unresolved governance concern
  • No monitoring period, verified ERR, or verification report is present in the extracted record, so actual credit delivery cannot be confirmed
  • Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of the extracted facts

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversal data

Leakage

0% deemed negligible; minor doc contradiction

Baseline

Jurisdictional grid EF (standard CDM)

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents